Opportunity

Joplin Civicplus #MAIN STREET STREETSCAPES - 8TH ST TO 15TH ST

Joplin Main Street Streetscapes Improvements (8th St to 15th St) – Construction and Streetscape Upgrades

Posted

April 25, 2026

Respond By

May 19, 2026

Identifier

MAIN STREET STREETSCAPES - 8TH ST TO 15TH ST

NAICS

237310, 237990

The City of Joplin, Missouri is seeking bids for the Main Street Streetscapes project, a comprehensive public infrastructure improvement along Main Street from 8th Street to 15th Street. - Government Buyer: - City of Joplin, Missouri, Director of Public Works - Project Scope: - Milling and overlaying of Main Street roadway - Installation of new curb and gutter (approx. 3,760 linear feet) - Construction of sidewalks (approx. 3,290 square yards of standard, 1,019 square yards of stamped concrete) - Street lighting and tree well uplighting throughout the project area - Installation of two new traffic signals (9th and 10th Streets) - Decorative elements: brick pavers (483 units), mosaic paver, stamped concrete, benches (12), litter receptacles (10), decorative planters (5), district plaques (3) - Concrete pavement (approx. 3,600 square yards, 8" thick) - Stormwater improvements: storm sewer inlets, manholes, pipes, junction boxes - Silva Cell modular suspended pavement system (13,346 units) - Pavement markings for traffic and accessibility - Removal and replacement of existing signage - Products/Quantities (selected): - Asphaltic Concrete Surface (2"): 1,780 tons - Full Depth Asphalt Demo: 3,539 units - Aggregate Base (8"): 3,589 units (roadway), (2"): 3,645 units (sidewalk) - Commercial Driveway Construction (8" Concrete): 983 units - Tree Wells: 11 (downtown), 16 (midtown) - Services: - Construction staking and surveying - Erosion control - Traffic control during construction - Coal chute remediation - Notable Requirements: - Project is federally funded (HUD Community Project Funding) - Compliance with federal labor standards, prevailing wage laws (Missouri DOL or Davis-Bacon, whichever is higher), and Section 3 economic opportunity provisions - Mandatory OSHA 10-hour safety training for all on-site employees - Mandatory pre-bid meeting for all bidders - No specific OEMs named for traffic signals, lighting, or modular systems; vendors may propose suitable equipment meeting city and federal standards - Design Engineer: Olsson, Inc. - Plans and specifications available on the City’s website

Description

The City of Joplin, Missouri is soliciting sealed bids for public street improvements on Main Street from 8th Street to 15th Street. The project includes milling and overlaying the street, installing new curb and gutter, sidewalks, street lighting, new traffic signals at 9th and 10th Streets, stamped concrete, brick pavers, concrete intersections, and other necessary appurtenances. Bids must be submitted by 2:00 PM local time on May 19, 2026, and a mandatory pre-bid meeting will be held on May 5, 2026, at 2:00 PM at Joplin City Hall. Plans and specifications are available on the City’s website, and questions can be directed to Olsson, Inc.

View original listing