Opportunity
Merx #AB-2026-03472
Bridge Replacement and Construction Services for Municipal District of Bonnyville No. 87
Posted
May 04, 2026
Respond By
May 27, 2026
Identifier
AB-2026-03472
NAICS
237310, 237990, 238190, 238120
This opportunity involves a major bridge replacement and construction project in Alberta, managed by the Municipal District of Bonnyville No. 87. - Government Buyer: - Municipal District of Bonnyville No. 87 (local government authority in Alberta) - Scope of Work: - Removal and disposal of an existing two-span precast concrete girder bridge on timber piles - Supply, setup, and driving of galvanized and plain steel H piles at abutments and piers - Construction of abutment backwalls, wingwalls, and pier caps with new steel H-piles and stiffener plates - Placement of Class 1 heavy rock riprap for erosion control - Fabrication, delivery, and erection of three spans of type SL-510 prestressed girders - Backfilling at bridge ends and installation of new TL-2 low height thrie beam bridgerail, approach rail transition, and approach road guardrail - Roadway work and installation of silt fence for environmental protection - Products/Services Requested: - Bridge demolition and disposal - Steel H piles (galvanized and plain) - SL-510 prestressed concrete girders - Guardrails and approach rails (TL-2 low height thrie beam) - Heavy rock riprap - Silt fence - Unique/Notable Requirements: - Use of both galvanized and plain steel H piles - Installation of TL-2 low height thrie beam bridgerail system - Environmental protection measures (silt fence) - No specific OEMs, part numbers, or commercial vendors are named in the solicitation.
Description
This contract involves the removal and disposal of an existing two-span precast concrete girder bridge on timber piles. The work includes supplying, setting up, and driving galvanized and plain steel H piles at abutments and piers, constructing abutments backwalls and wingwalls with new steel H-piles, abutment and pier caps with stiffener plates, and Class 1 heavy rock riprap. Additionally, the project requires fabrication, delivery, and erection of three spans of type SL-510 prestressed girders, backfilling at bridge ends, installation of new TL-2 low height thrie beam bridgerail and approach rail transition, approach road guardrail, roadway work, and installation of silt fence. The project is located in Alberta and is issued by the Municipal District of Bonnyville No. 87.