Opportunity

Cole County Civicplus #BRO-R026(001)

Sturbridge Drive Bridge Replacement Project – Cole County, Missouri

Posted

April 12, 2026

Respond By

May 07, 2026

Identifier

BRO-R026(001)

NAICS

237310, 237990

Cole County Department of Public Works is seeking bids for the Sturbridge Drive Bridge Replacement project, a major infrastructure initiative in Jefferson City, Missouri. - Project Scope: - Demolition and removal of the existing bridge structure - Construction of a new 42-foot single span prestressed concrete spread box beam bridge - Installation of galvanized structural steel piles (136 linear feet) and 17-inch prestressed concrete spread box beams (129 linear feet) - Construction of bridge approach slabs (116 square yards), bituminous pavement (93 tons), and aggregate base for both permanent and temporary bypass (854 square yards) - Installation of bridge guardrail (Thrie beam, 100 linear feet), crashworthy end terminals, and 36-inch corrugated metal pipe for temporary bypass (96 linear feet) - Additional work includes clearing and grubbing, excavation, embankment, seeding, silt fence, rock blanket, construction signage, and erosion control measures - Notable Requirements: - All bidders must be on MoDOT’s Qualified Contractor List and submit a contractor questionnaire in advance - Bid, performance, and payment bonds are required - Project is subject to prevailing wage rates and is sales tax exempt - Completion required within 90 calendar days after notice to proceed - No specific OEMs are named, as standard construction materials and methods per Missouri and City of Jefferson specifications are required - Place of performance is in Jefferson City, Missouri, with the contracting office at the Courthouse Annex, Room 200, 311 East High Street

Description

This solicitation is for the replacement of the Sturbridge Drive Bridge located in Section 5, Township 44 N, Range 21 W. The work includes demolition of the existing bridge and construction of a new 42-foot single span prestressed concrete spread box beam bridge. Additional work involves installation of guardrail, riprap, permanent erosion control, and incidental work as per plans and specifications. Bidders must be on MoDOT's Qualified Contractor List and submit required documentation prior to bid opening.

View original listing