Opportunity

Georgia Procurement Registry #PE-66895-NONST-2026-000000050

Pre-Engineered Metal Building for Water Reclamation Facility – City of Cumming, GA

Posted

May 04, 2026

Respond By

June 05, 2026

Identifier

PE-66895-NONST-2026-000000050

NAICS

236210, 332311, 238190

This opportunity involves the procurement of a pre-engineered metal building (PEMB) for the Bethelview Road Advanced Water Reclamation facility in Cumming, Georgia. - Government Buyer: - City of Cumming, Georgia (local government) - Project location: Bethelview Road Advanced Water Reclamation facility - Products/Services Requested: - Pre-engineered metal building (PEMB), 60' x 80' clear span, 20' eave height - 26-gauge metal roof and wall panels - 2-inch closed-cell spray foam insulation - 6-inch thick concrete slab with reinforcement and drainage - Two 3' x 7' insulated hollow metal man doors - Three roll-up doors (manual/chain hoist, with alternate pricing for motorized operation) - Foundation, gutters, downspouts, and site drainage - Turnkey project: includes design, engineering, fabrication, delivery, erection, permitting, inspections, and site cleanup - Unique/Notable Requirements: - Engineering drawings must be sealed by a licensed professional engineer in Georgia - Compliance with Georgia State Minimum Standard Building Code - Contractor responsible for all permitting and inspections - All materials, labor, and services for a complete, ready-to-use building - OEMs/Vendors: - No specific OEMs or vendors are named; open to all qualified contractors capable of meeting the requirements

Description

The City of Cumming, Georgia is soliciting sealed proposals from qualified contractors for the design, engineering, fabrication, delivery, and erection of a pre-engineered metal building (PEMB). The project includes all materials, labor, and services necessary to deliver a complete and functional structure, including foundation, insulation, doors, and drainage systems. The building will be located at the City of Cumming's Bethelview Road Advanced Water Reclamation facility. Contractors must comply with Georgia State Minimum Standard Building Code and provide engineering sealed by a licensed professional engineer in Georgia. The scope includes turnkey services such as engineering, permitting, fabrication, delivery, erection, and site cleanup.

View original listing