Opportunity

CanadaBuys #AB-2026-03516

Engineering and Construction of Concrete Floor Slab for Reynolds Museum Storage Building

Posted

May 04, 2026

Respond By

May 25, 2026

Identifier

AB-2026-03516

NAICS

238110, 236220

This opportunity involves engineering and construction services for a concrete floor slab and driveway approach pad at the Reynolds Museum storage building in Wetaskiwin, Alberta. - Government Buyer: - Arts, Culture and Status of Women agency - Contracting office located at 10405 Jasper Ave, Edmonton, Alberta - Scope of Work: - Engineering and construction of a 60 x 180 ft concrete floor slab for an existing storage building - Includes subgrade preparation, gravel base, poly barrier installation, fiber-reinforced concrete, rebar, power trowel finish, control cuts, and permits - Construction of a concrete driveway approach pad outside the overhead door - Contractor must supply portable generator and lighting if needed - Engineering report for the floor slab is required - OEMs and Vendors: - No specific OEMs named - Concrete supplier must be certified through Concrete Alberta (Concrete Alberta certification is a notable requirement) - Unique Requirements: - Concrete Alberta certification for supplier - Contractor responsible for temporary power and lighting - Engineering report must be provided - Place of Performance: - Reynolds Museum, 6426 40 Avenue, Wetaskiwin, Alberta, T9A 1W8 - Contract Duration: - Approximately two months

Description

This solicitation is for the engineering and construction of a concrete floor slab measuring 60 x 180 ft for an existing storage building, including a concrete driveway approach pad outside the front building overhead door. The scope covers subgrade preparation, gravel base, poly barrier, concrete slab with fiber reinforcement, rebar, power trowel finish, control cuts, and necessary permits. The contractor must provide their own portable generator and lighting if needed, and the concrete supplier must be certified through Concrete Alberta. An engineering report for the floor is required. The contract duration is approximately 2 months starting around May 29, 2026.

View original listing