Opportunity
Wichita Falls Independent School District Ionwave #2526-21-S-27 STEP 1 Addendum 5
WFISD Zundy Elementary School Refresh and Elevator Modernization Award
Posted
March 13, 2026
Respond By
April 01, 2026
Identifier
2526-21-S-27 STEP 1 Addendum 5
NAICS
238290, 238210, 238990
Wichita Falls Independent School District (WFISD) has awarded a contract for major upgrades at Zundy Elementary School, focusing on a campus refresh and full elevator modernization. - Government Buyer: - Wichita Falls Independent School District (WFISD), Purchasing Department - OEMs and Vendors: - Aspen Elevator (approved elevator manufacturer) - TK Elevator (TAC 32H controller and elevator components) - BYSParchitects (architectural design) - Commercial and Industrial Electronics (fire panel programming) - Products and Services Requested: - Full modernization of the existing hydraulic elevator, including: - TK Elevator TAC 32H controller and components - LD-16 Plus door operators - EP-60 hydraulic power unit - Car and hall fixtures, selector tape, pit equipment, and wiring packages - Aspen Elevator as an approved alternative manufacturer - Campus refresh including: - One-for-one replacement of all lighting fixtures with new LED units (except main gym) - Replacement of 40 LED exit lights - VCT flooring for gym (156 units) and cafeteria (139 units) - Interior signage, brick tuckpointing, and asbestos abatement allowances - Foundation stabilization (compaction grouting, helix/micro piles, south wing stabilization) - Turnkey services: - Demolition, painting, ceiling upgrades, and fire alarm work by licensed contractors - Elevator/fire alarm interface coordination - On-site training for maintenance staff - All permits, materials, labor, tools, and equipment included - Unique/Notable Requirements: - All elevator modernization work must be compatible with existing Dover equipment - Coordination with fire and security integrators for elevator/fire alarm interface - Compliance with city and Texas Department of Licensing and Regulation inspections - Strict scheduling to ensure campus is ready for reopening - Alternates for foundation stabilization and flooring - Warranty and closeout documentation required - Place of Performance: - Zundy Elementary School, 1706 Polk Street, Wichita Falls, TX - WFISD Purchasing Department, 1104 Broad Street, Wichita Falls, TX - Awarded Supplier: Trinity Hughes Construction
Description
The Wichita Falls Independent School District (WFISD) is soliciting Request for Qualifications and Competitive Sealed Proposals for two projects: the Zundy Elementary School Refresh and the Zundy Elevator Modernization. The Zundy Refresh project involves limited demolition, painting, ceiling and lighting refresh, and other miscellaneous items to prepare the campus for reopening in August 2026. The Elevator Modernization project entails a full modernization of the existing elevator at the campus. Both projects are turnkey, requiring all permits, materials, labor, tools, and equipment necessary for completion. Vendors must submit qualifications and pricing in a two-step process to be considered.