Opportunity
New Brunswick Opportunities Network #FRE-25016941-
Village of McAdam Stormwater Infrastructure Upgrade – Route 4 / Saunders Road
Posted
May 01, 2026
Respond By
May 20, 2026
Identifier
FRE-25016941-
NAICS
237110, 237310, 237990
This procurement opportunity involves a major stormwater infrastructure upgrade for the Village of McAdam, New Brunswick: - Government Buyer: - Village of McAdam (procurement managed from 146 Saunders Road, McAdam, NB) - Project Scope: - Construction services for Route 4 / Saunders Road Storm Upgrade - Includes installation of storm pipes (250mm, 375mm, 450mm), storm manholes (750mm, 1200mm), concrete curb and gutter, asphalt milling and paving, aggregate base and subbase, granular surfacing, guide rails and posts, pavement markings, topsoil and hydroseeding, and flushing of existing culverts - Selective site demolition, mobilization, and construction traffic control are also required - Products/Materials Requested (with part numbers and quantities): - R25 Riprap (220 units, 31 37 10) - N2 Geotextile (100 units, 31 32 21) - Asphalt Milling Partial Depth (4750 units, 32 01 15) - Aggregate Subbase 75mm Crushed Rock (2570 units, 32 11 19) - Aggregate Base 31.5mm Crushed Rock (1550 units, 32 11 23) - Asphalt Concrete Type B (280 units, 32 12 16) - Asphalt Concrete Type D (880 units, 32 12 16) - Concrete Curb and Gutter (1170 units, 32 13 15) - Granular Surfacing 19mm Minus Crushed Rock (210 units, 32 15 40) - New Guide Rail (110 units, 32 17 00) - New Guide Posts (30 units, 32 17 00) - Removal of Guide Rail (71 units, 32 17 00) - Removal of Guide Posts (18 units, 32 17 00) - Pavement Markings (1 lump sum, 32 17 23) - Topsoil and Hydroseed (1200 units, 32 92 20) - 250mm Storm Pipe (156 units, 33 45 00) - 375mm Storm Pipe (132 units, 33 45 00) - 450mm Storm Pipe (215 units, 33 45 00) - Storm Manhole 750mm (6 units, 33 45 00) - Storm Manhole 1200mm (11 units, 33 45 00) - Adjustment of Existing Structures (6 units, 33 45 00) - Flushing of Existing Concrete Culverts (5000 units, 33 10 00) - Construction Traffic Control (5000 units, 30 20 00) - Mobilization (1 lump sum, 30 10 00) - Notable Requirements: - Compliance with NBDTI Standard Specifications for Highway Construction - Maintaining access for residents and emergency vehicles during construction - Bid bond or certified cheque for 10% of bid price required; performance and payment bonds required for award - Substantial completion required by September 1, 2026 - No specific OEMs or material manufacturers are named in the solicitation - Bid documents available from EXP Services Inc., Fredericton, NB
Description
The Village of McAdam, New Brunswick is soliciting sealed bids for the Route 4 / Saunders Road Storm Upgrade project. Bids must be submitted by 2:00 p.m. local time on May 20, 2026, and will be publicly opened immediately thereafter at the Village of McAdam office. Bid documents are available from EXP Services Inc. for a non-refundable fee of $100.00 per set. Bidders must include a bid bond or certified cheque amounting to 10 percent of the bid price. The successful bidder will be required to provide performance and payment bonds as specified. The owner reserves the right to award none, part, or all of the work.