Opportunity

Merx #0000321073

Town of Carman 2026 Street Work: Milling, Asphalt Paving, and Concrete Repairs

Posted

April 30, 2026

Respond By

May 21, 2026

Identifier

0000321073

NAICS

237310, 238990

This opportunity involves the Town of Carman's 2026 street work project, seeking qualified contractors for a range of roadwork and infrastructure improvements: - Government Buyer: - Town of Carman (Manitoba, Canada) is the procuring entity - Scope of Work: - Milling and asphalt paving (2,050 sq m on 2nd Ave NW) - Concrete curb and gutter repairs (256 m roll curb, 108 m curb and gutter repair) - Concrete base work (approx. 1,400 sq m in two project areas) - Asphalt patching (450 sq m at various locations, 3 inches thick) - Waste excavation and removal of pavement and sub-grade - Surface preparation with geotextile and asphalt prime application - Asphalt paving in two lifts, meeting Manitoba Department of Infrastructure specifications - Concrete curb and gutter installation using 30-MPa Portland cement concrete (CSA A23.1 compliant) - Asphalt surface repairs with specified compaction and thickness - Quantities and Locations: - Detailed quantities and street segments specified for each work area - Requirements: - All materials and workmanship must comply with Manitoba provincial and municipal codes - Contractor responsible for all labor, materials, and incidentals - Lump sum pricing required - Completion deadline is on or before September 1, 2026 - OEMs and Vendors: - No specific OEMs, brands, or part numbers are named; materials must meet provincial standards - Notable Details: - Work includes both new construction and repairs - All asphalt and concrete must meet specified technical standards - Excavated materials to be disposed of or stockpiled as directed

Description

The Town of Carman is inviting bids for the 2026 street work project involving milling, asphalt paving, concrete curb and gutter repairs, and asphalt patching on various streets in Carman, Manitoba. The project includes five specific areas with detailed specifications for milling depths, asphalt thickness, concrete work, and curb repairs. Contractors are responsible for supplying and placing lifter rings, stockpiling millings, and ensuring all curbs remain except where repairs are specified. The work must be completed by September 1, 2026, and bids are to be submitted electronically or physically with lump sum pricing.

View original listing