Opportunity
Hawaii eProcurement Portal #B26002616
Boat Lift System Installation at Pier 1, Hilo Harbor, Hawaii
Posted
April 30, 2026
Respond By
June 04, 2026
Identifier
B26002616
NAICS
237990
This opportunity involves the installation of a new boat lift system at Pier 1, Hilo Harbor, Hawaii, for the State of Hawaii Department of Transportation, Harbors Division. - Government Buyer: - State of Hawaii Department of Transportation, Harbors Division, Air and Water Transportation Facilities Division - OEMs and Vendors: - IMM Quality Boat Lifts (Platinum Elevator Boat Lift specified as basis of design) - Approved equivalent manufacturers may be proposed - Products/Services Requested: - Pre-engineered aluminum boat lift structure (Platinum Elevator Boat Lift, 16,000 lbs capacity, or approved equivalent) - Micropile foundations (2 units, 5.5-inch diameter, minimum 25 feet length, 15 kips load capacity) - Electrical work (branch circuit, underground distribution, handholes, ductlines, conductors, testing, as-built drawings) - Chain link fences and gates (including removal, barbed wire, site security) - Aggregate base course and asphalt concrete pavement - Cast-in-place concrete (materials, reinforcement, curing, finishing, crack repair) - Temporary water pollution, dust, and erosion control (site-specific BMP plan) - Mobilization and demobilization - Security services (perimeter control and access management as requested by the State) - Unique/Notable Requirements: - Boat lift must be Platinum Elevator Boat Lift by IMM Quality Boat Lifts or approved equivalent - Contractor must hold a valid State of Hawaii General Engineering A license at time of bidding - Minimum 80% Hawaii resident workforce required - Compliance with all state and federal safety, environmental, and security regulations (including TWIC credentials for personnel) - Contract duration is 180 calendar days from Notice to Proceed, with liquidated damages for delays - Estimated construction cost: $350,000 to $450,000
Description
This solicitation is for the installation of a new pre-engineered elevator boat lift structure and its foundation at Pier 1, Hilo Harbor, Hawaii. The work includes trenching for electrical conduits, installation of electrical connections for the boat lift, and restoration of asphalt concrete pavement, chain link fencing, gates, and other miscellaneous site elements. Each boat lift track will be mounted on a concrete pile cap supported by micropile below. The estimated construction cost ranges from $350,000 to $450,000.