Opportunity
Georgia Procurement Registry #PE-55210-NONST-2027-000000006
Fire Alarm System Replacement for Social Circle Middle/High School
Posted
April 30, 2026
Respond By
May 14, 2026
Identifier
PE-55210-NONST-2027-000000006
NAICS
238210, 561621
This opportunity seeks qualified firms to replace the fire alarm and emergency notification system at Social Circle Middle/High School. - Government Buyer: - Social Circle City Schools (K-12 public school district) - Products and Services Requested: - Complete replacement of the existing fire alarm and emergency notification system - New addressable, non-proprietary fire alarm control system - Voice evacuation components, notification appliances, initiating devices, modules, power supplies, batteries - Smoke and heat detectors, duct detectors - System integration with existing monitoring, HVAC, door release, and PA systems - Removal and disposal of the old system - System installation, programming, testing, and commissioning - Site verification, design, engineering support - Training, documentation, and as-built drawings - Unique or Notable Requirements: - System must be fully code-compliant and designed for long-term reliability - At least 20% spare capacity required in the new system - Owner must have access to programming and diagnostics (non-proprietary solution) - No loss of fire protection coverage during implementation - Proposals must include technical approach, manufacturer/model list, warranty options, and evidence of local service support - Preference for NICET-certified technicians - Minimum one-year warranty required, with options for extended warranties - OEMs and Vendors: - No specific OEMs or vendors are named; the solicitation emphasizes non-proprietary solutions to avoid vendor lock-in
Description
This solicitation is for the replacement of the fire alarm system at Social Circle Middle/High School. The project includes furnishing, installation, programming, testing, and commissioning of a new addressable fire alarm and emergency notification system. The system must be code-compliant, maintainable, non-proprietary, and designed for long-term operational needs. The scope includes removal of existing equipment, installation of new control systems, voice evacuation components, detectors, notification devices, and all associated labor and services. Proposals are due by May 14, 2026, and the project aims for substantial completion by July 10, 2026.