Opportunity

Guilford County NC MUNIS #20212

500kW Diesel Generator Replacement for High Point Courthouse & Detention Center

Posted

March 11, 2024

Respond By

April 11, 2024

Identifier

20212

NAICS

238290, 236210

Guilford County Facilities is seeking bids for the replacement of a 500kW diesel generator system at the High Point Courthouse & Detention Center in High Point, North Carolina. - Government Buyer: - Guilford County Facilities Department - Project Manager: Kevin Bates - OEMs and Vendors: - Blue Star Power Systems (PD500-01 generator) - Perkins (2506C-E15TAG3 engine, or comparable) - ASCO (Series 300 automatic transfer switch) - Products/Services Requested: - 500kW diesel emergency standby generator (Blue Star Power Systems PD500-01 or equal) - Perkins 2506C-E15TAG3 engine or comparable - 72-hour sub-base fuel tank - Control panel, vibration isolation, sound attenuating enclosure - Industrial alternator, voltage regulator, remote annunciator, powder coat enclosure, level III sound attenuation, radiator, circuit breaker, block heaters, single stage air cleaner, exhaust silencer, industrial batteries, battery charger, OSHA-compliant access steps/platform, 2-year/2000-hour warranty - Automatic transfer switch (ASCO 300SE-Type 1, 800A, quick-connect with camlock junction box) - Generator quick connect switchboard - Panelboards, wiring devices, cable tray, raceways, surge protection devices - LED interior lighting and lighting control devices - Temporary generator during construction - Services: - Removal of existing 500kW generator, fuel tank, and related infrastructure - Installation of new generator system and associated electrical work - Selective demolition, site preparation, concrete work for generator slab - Provision of temporary generator during construction - Unique/Notable Requirements: - Generator must be diesel-engine-driven, rated at 500kW, and provide 72-hour run time - All work must be performed by licensed North Carolina contractors - MWBE participation goal of 10-15% - Liquidated damages of $100 per day for late completion - Safety and structural compliance, including OSHA standards - Place of Performance: - High Point Courthouse & Detention Center, 507 East Green Drive, High Point, NC 27260 - Associated contracting offices in Greensboro, NC

Description

This is a formal invitation for bid (IFB) for the replacement of the generator at the High Point Courthouse and Detention Center. The project involves the removal of the existing 500KW diesel generator and associated equipment and fuel tank, and the installation of a new 500KW diesel generator with sub-base fuel tank and associated equipment. A non-mandatory pre-proposal ZoomGov meeting is scheduled, and questions are accepted until March 25, 2024. The bid submission deadline is April 11, 2024, and the approximate award date is June 11, 2024.

View original listing