Opportunity

Lowndes County School District Civicplus #MOODY WATER PLANT CHEMICAL ROOM REHAB

Rehabilitation of Chemical Storage Room at Moody Water Plant, Valdosta, GA

Posted

April 29, 2026

Respond By

June 11, 2026

Identifier

MOODY WATER PLANT CHEMICAL ROOM REHAB

NAICS

238190, 238210, 238220

This opportunity involves the rehabilitation of the chemical storage room at the Moody Water Plant in Valdosta, Georgia, managed by the Lowndes County Utility Department. - Government Buyer: - Lowndes County Board of Commissioners, Utility Department (Utilities Department Conference Room, 327 N. Ashley Street, Valdosta, GA 31601) - Scope of Work: - Surface preparation and painting of the chemical storage room - Replacement of electrical components - Installation of chemical drains - Replacement of chemical feed and storage containers - Installation of roof drain pipes - Products/Services Requested: - Chemical feed and storage containers (replacement) - Electrical components (replacement) - Roof drain pipes (installation) - Surface preparation and painting - Chemical drain installation - Unique/Notable Requirements: - Compliance with Moody AFB Design Guide and UFC 1-200-01 DOD Building Code, as well as all current Unified Facilities Criteria (UFCs) - Bidders must be licensed contractors in the State of Georgia - Submission of a 5% bid bond is required - Complete descriptive literature and manufacturer's specifications must be submitted for each equipment type offered - Special consideration for availability of repair parts and service - Mandatory pre-bid meeting required - Lump sum payment structure - One-year warranty period from final acceptance - Liquidated damages of $500 per day for delays beyond contract period - No specific OEMs or vendors are named in the solicitation documents.

Description

This solicitation is for the rehabilitation of the chemical storage room at the Moody Water Plant located in Valdosta, Georgia. The project scope includes surface preparation, painting, electrical component replacement, chemical drain installation, chemical feed and storage container replacement, and roof drain pipe installation. The contract duration is 120 calendar days. A mandatory pre-bid meeting is scheduled for May 28, 2026, at 11:00 AM EST, and sealed proposals are due by June 11, 2026, at 11:00 AM.

View original listing