Opportunity
Regional Alliance Marketplace for Procurement #E1909562
Emergency Slope Repair Construction at Vista Del Mar, Los Angeles
Posted
April 28, 2026
Respond By
May 07, 2026
Identifier
E1909562
NAICS
237990, 238190, 238990
This opportunity is for emergency slope repair construction at Vista Del Mar in Los Angeles, managed by the Engineering Bureau of the Public Works Department, City of Los Angeles. - Government Buyer: - Engineering Bureau, Public Works, City of Los Angeles - Eligible Bidders: - Only five prequalified contractors: Calex Engineering, Clarke Contracting, Jilk Heavy Construction, Inc., Mike Prlich & Sons, Inc., and Mladen Buntich Construction Company - Products/Services Requested: - Construction of approximately seven pipe and board walls (5 feet tall, 10-20 feet long each) for erosion gully repair and lateral support - Removal and replacement of a 5-foot wide by 70-foot-long section of damaged paving, curb, and gutter - Installation of new asphalt concrete paving and Type C integral curb and gutter - Construction of a 4-foot tall chain link fence - Filling of a void behind the existing structure with slurry - Notable Requirements: - Work must minimize lane closures and comply with the WATCH manual for traffic control - Construction will occur in sandy soil conditions - Only prequalified contractors may access the bid package and submit bids via email due to the short bid period - No specific OEMs or proprietary products are named; the focus is on construction services and materials - Place of Performance: - Vista Del Mar near Fontainbleau Street, Los Angeles, CA - Work is at a city-owned site requiring coordination with local authorities
Description
This project involves constructing a pipe and board structure to repair an erosion gully and restore lateral support to Vista Del Mar. The scope includes building approximately seven pipe and board walls, each 5 feet tall and ranging from 10 to 20 feet in length, removing and replacing damaged paving and curb, and constructing a chain link fence. The work will be performed on or from Vista Del Mar with minimal lane closures and traffic control following the WATCH manual. Only five specified contractors can bid as Prime Contractor, and bids must be submitted via email due to a short bid period.