Opportunity
SAM #FA813726R0016
Tinker AFB Iszard Pool House Wall, Roof, and Electrical Replacement Project (B5730)
Buyer
AFSC PZIOC
Posted
April 29, 2026
Respond By
June 15, 2026
Identifier
FA813726R0016
NAICS
238190, 238210, 238220, 238160, 238320, 238310, 238990
This opportunity involves a major construction project at Tinker Air Force Base, Oklahoma, to replace and upgrade the walls and related infrastructure of the Iszard Pool House (Building 5730):
Government Buyer
- U.S. Air Force, Air Force Sustainment Center (FA8137 AFSC PZIOC), 72nd Air Base Wing Civil Engineering (72 ABW/CE)
- Contracting office located at 7799 Arnold Ave, Bldg 3, Tinker AFB, OK
Scope of Work
- Demolition and replacement of existing CMU fence walls, wood and masonry privacy fences with 8-foot-tall metal shadow style privacy fences (based on Cambridge Style Shadow Fence by Basteel, color Patrician Bronze)
- Replacement of utility gates and installation of new concrete sidewalks, pads, and pool deck extensions
- Roof system replacement with a fully adhered 80-mil white PVC membrane (ASTM/ASHRAE compliant), polyisocyanurate insulation (R-25), and new metal flashings, gutters, and downspouts
- Electrical upgrades: new panelboards, outlets, GFCI receptacles, galvanized lighting poles with Lithonia RSX2 LED fixtures, LED wallpacks (Lithonia TWRI-LED), vapor tight wall-mounted fixtures, and LED exit signs (Lithonia EDG)
- Relocation of storage shed and hazardous material abatement (asbestos, lead-based paint)
- All materials, labor, equipment, and quality control services to be provided by the contractor
OEMs and Vendors Mentioned
- Basteel (Cambridge Style Shadow Fence)
- Lithonia Lighting (RSX2 LED, TWRI-LED, EDG exit signs)
Products/Services Requested
- Metal privacy fence panels and gates (Basteel Cambridge Style)
- Concrete sidewalks, pads, and pool deck extensions
- PVC roof system and accessories
- Electrical equipment and fixtures (Lithonia Lighting)
- Construction services for demolition, installation, and hazardous material abatement
Unique or Notable Requirements
- Project is restricted to Small Business MAC BOA holders
- Mandatory attendance at initial site visit for proposal eligibility
- Contractor must provide key personnel with specific experience and certifications (Project Manager, Quality Control Manager, Site Safety Officer, Superintendent)
- Adherence to UFC and Air Force construction standards
- Environmental requirements: abatement of asbestos-containing materials and lead-based paint
- Work to be performed during pool's offseason (approx. 8 months), with a 180-day completion window after notice to proceed
- All work to be performed during normal duty hours unless otherwise authorized
Estimated Contract Value
- Between $500,000 and $1,000,000
Place of Performance
- Iszard Pool House, Building 5730, Tinker Air Force Base, Oklahoma
Description
29 April 2026
UPDATED TO ADD SOLICITATION
Proposal due date: 15 June 2026
============================================
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0016
Project Title: WWYK250172 – REPLACE WALLS OF ISZARD POOL HOUSE Project Location: Tinker AFB -B5730 Repair Walls of the Iszard Pool House at project location within B5730 at Tinker Air Force Base (AFB) Oklahoma 73145
The estimated project value is between $500,000 and $1,000,000 and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 3 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
Initial Site Visit was held on 25 March 2026.
You must have attended the initial site visit to be considered eligible to propose..
This posting is for Tinker AFB - MAC BOA Holders ONLY.