Opportunity
Merx #0000320755
Roof Replacement Project at Stanley Knowles School – Winnipeg School Division No. 1
Posted
April 28, 2026
Respond By
May 13, 2026
Identifier
0000320755
NAICS
238160, 236220, 238190
This opportunity involves a major roof replacement project at Stanley Knowles School for the Winnipeg School Division No. 1. - Government Buyer: - Winnipeg School Division No. 1 - OEMs and Vendors Mentioned: - Soprema - Siplast - Plasti-Fab - Fernco Inc. - Thaler Metal Industries Ltd. - Zurn - Bilco - Dow Corning - Armacell - Products and Materials Requested: - Removal and replacement of approximately 21,000 sq. ft. of roofing - Roofing system components (e.g., DensDeck Prime/Securock sheathing, polyisocyanurate insulation, tapered insulation, acoustical steel deck flute insulation) - Multiple specified products with OEM options, including: - Sopraguard Tape (Soprema) or Modiflex Tape (Siplast) - Elastocol 500 (Soprema) or PA-917 (Siplast) primer - Elastophene SP 2.2 (Soprema) or Paratech Glass Base TG (Siplast) air/vapour barrier - Sopravapr (Soprema) or SA Vapor Retarder (Siplast) for expansion/control joints - Sopra-Iso + (Soprema), Paratherm CG (Siplast), or Plasti-Fab insulation - Soprarock Flute Filler (Soprema) - Sopra-Iso Plus Hinged Sump or Siplast Sumps - DuoTack adhesive (Soprema) or Parafast Insulation Adhesive (Siplast) - Colvent Base 830 (Soprema) or Paradiene TS SA (Siplast) base sheet - Sopraply Traffic Cap (Soprema) or Parafor 30 TG (Siplast) cap sheet - Sopraply Flam Stick (Soprema) or Paradiene 20 SA (Siplast) flashing membrane - Vent Pipe Expansion Joint: XJ Series by Fernco Inc. - Insulated Vent Flashing: Thaler Metal Industries Ltd. Model SJ-26-A - Roof Drains: Zurn Model Z105-N3-ZA-VP - Roof Ladder Safety Up-Post: Bilco LadderUp Safety Post LU-1 - Sealants: Dow Corning 795 - Refrigerant Piping Insulation: Armacell AP Armaflex - Additional construction materials (blocking, sheet steel flashings, adhesives, sealants, pipe/duct insulation, etc.) - Services Requested: - Full roof replacement construction services, including removal, installation, mechanical/electrical adjustments, safety compliance, and site cleanup - Warranty services: 5-year RCAM warranty with annual inspections and 15-year manufacturer warranty - Unique/Notable Requirements: - Roofing system must meet specified wind uplift standards - Contractor must be a member of recognized roofing associations - Compliance with Manitoba safety and regulatory standards - Mandatory site walkthrough for bid eligibility - 10% bid bond required - Procurement governed by CFTA and NWPTA trade agreements - CCDC2-2020 Stipulated Price Contract form - Project must be ready for school opening; strict completion timeline - Place of Performance: - Stanley Knowles School, 2424 King Edward Street, Winnipeg, Manitoba, Canada
Description
This solicitation is for the roof replacement at Stanley Knowles School located at 2424 King Edward Street, Winnipeg, Manitoba, Canada. The project includes partial removal and replacement of the existing roofing system, as well as mechanical and electrical work. Bidders must include a bid bond of 10% of the bid price and conform to the Winnipeg School Division Bonding and Insurance Requirements. A mandatory site walkthrough is scheduled for May 5, 2026, and the bid closing date is May 13, 2026. The procurement is subject to Canadian Free Trade Agreement (CFTA) and New West Partnership Trade Agreement (NWPTA).