Opportunity

Palm Coast Records #ITB-SWE-26-34

Palm Coast 19 Central Place Stormwater Pipe Replacement and Site Restoration

Posted

April 29, 2026

Respond By

May 14, 2026

Identifier

ITB-SWE-26-34

NAICS

237110, 237990, 238190

This opportunity from the City of Palm Coast seeks a qualified contractor for the 19 Central Place Pipe Replacement project. - Government Buyer: - City of Palm Coast Budget and Procurement Office - Scope of Work: - Removal of existing stormwater culvert pipes - Installation of a new 15-inch HDPE drainage system - Construction of a new retaining wall (including concrete footing, masonry units, grout, rebar, and concrete lintel) - Placement of coquina rock rip-rap and stone base for erosion control - Roadway restoration with new asphalt patching - Full site restoration, including regrading and sodding of disturbed areas - Services Required: - All labor, materials, equipment, supervision, and permitting - Traffic control compliant with FDOT and MUTCD standards - Utility coordination, including Sunshine 811 notifications - Erosion and sediment control measures (e.g., silt fence, turbidity barriers) - Compaction and density testing for quality control - Preparation and submission of as-built drawings sealed by a Florida-licensed surveyor - Unique/Notable Requirements: - Contractor must coordinate with utilities and ensure all work meets local and state standards - As-built documentation by a licensed surveyor is mandatory - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Products/Materials Requested: - 15-inch HDPE drainage pipe system - Coquina rock rip-rap - Concrete, masonry, and rebar for retaining wall - Asphalt patching materials - Sod for landscaping restoration

Description

The City of Palm Coast is soliciting bids for the replacement of stormwater culvert pipes at 19 Central Place. The project includes removal of existing pipes and installation of a new 15-inch HDPE drainage system, construction of a retaining wall, placement of coquina rock rip-rap, roadway restoration, and site restoration. The contractor must also manage traffic control, erosion and sediment control, and utility coordination. The contract time for substantial completion is 30 calendar days with an additional 15 days for final completion.

View original listing