This opportunity from the Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), under the Department of Energy, seeks contractors for a major transmission line upgrade and substation construction in Wyoming. - Government Buyer: - Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), Department of Energy - Scope of Work: - Upgrade approximately 35 miles of the Lusk Rural Tap-Glendo (LRT-GLD) transmission line from 69-kV to 115-kV - Replace existing line with new 115-kV wood pole H-frame line - Sectionalize into two segments: 25.4-mile Casper (Pace)-Quinn Creek and 9.4-mile Quinn Creek-Lusk Rural Tap - Quinn Creek-Lusk Rural Tap segment will be built to 115-kV specs but operated at 69-kV initially - Construct a new Quinn Creek Substation on about 5 acres of open rangeland - Contractor must provide all labor, materials, tools, equipment, transportation, and resources - Requirements: - Buy American Act applies; bidders must identify any non-domestic materials - No specific OEMs, vendors, or part numbers are named - Locations: - Work performed in Niobrara and Platte Counties, Wyoming - Key sites: Glendo Substation, Lusk Rural Tap, and new Quinn Creek Substation - Period of Performance: - Up to 800 calendar days after Notice to Proceed or by December 2028

Description

NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted.The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project.The Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and new Quinn Creek Substation projects aim to enhance WAPA’s ability to provide reliable and cost-efficient electric power, aligning with WAPA’s mission. WAPA benefits from the transmission line upgrades by resolving deteriorating conditions on the existing Glendo – Lusk Rural Tap 69kV line.The principal components of work include the following:Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) is proposing to upgrade 35 miles of its Lusk Rural Tap-Glendo (LRT- GLD) 69-kV transmission line to a 115-kV transmission line (Upgrade) in Platte and Niobrara counties, Wyoming and construct a new substation located in Niobrara County, Wyoming. The Upgrade starts at the Glendo Substation (GLD) and runs generally northeast for approximately 25 miles (25.4 miles). A new substation and delivery point named Quinn Creek Substation (QCK) will be constructed in this location. From the QCK Substation, the Upgrade will continue in a northeast direction for approximately 3 miles, it would then run east for approximately 6 miles and terminate at WAPA’s Lusk Rural Tap (LRT) just west of the town of Lusk.The Upgrade consists of replacing the LRT-GLD line with a new 115-kV wood pole H-frame transmission line. The new Quinn Creek Substation (QCK), with a 69-kV delivery point, will be constructed on about 5 acres on open rangeland. The Upgrade will be sectionalized into a 25.4-mile-long section called Casper (Pace)-Quinn Creek (CPL-QCK), a 9.4-mile-long Quinn Creek-Lusk Rural Tap (QCK-LRT) will be constructed to 115-kV specifications but operated at 69-kV for the near term. The Upgrade will be constructed on existing ROW, widened by 20 to 25 feet to provide proper clearance for the higher voltage, lengthened spans, and potentially greater blow-out.Location:Platte and Niobrara, 82213, 82227, 82225Glendo Substation (GLD) - 524 Glendo Park Road, Glendo, WY 82213Lusk Rural Tap (LRT) - Latitude: N 42° 46' 0"; Longitude: W 104° 28' 52"; Datum: NAD83/WGS84Quinn Creek Substation - New Substation, approximately 25 miles Northeast from Glendo SubstationThe anticipated period of performance is 800 days calendar days after Notice to Proceed or by December 2028. The estimated magnitude of construction is greater than $10M. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M.The solicitation including specifications and drawings will be issued electronically on or about 1 June 2026 at the following sites:https://www.fedconnect.net and https://www.sam.gov.NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material.Please see the link for Construction Change Order Definitization Notices -https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspxAdditional Links:Click here to see more information about this opportunity on FedConnect

View original listing