Opportunity

PIEE #W912EQ26RA001

Stringout System Rehabilitation at Ensley Engineer Yard, Memphis, TN

Buyer

W07V ENDIST MEMPHIS

Posted

April 27, 2026

Respond By

May 01, 2026

Identifier

W912EQ26RA001

NAICS

237990, 237310, 237130

The U.S. Army Corps of Engineers, Memphis District, is seeking contractors for a major rehabilitation project at Ensley Engineer Yard (EEY) in Memphis, Tennessee. - Government Buyer: - U.S. Army Corps of Engineers, Memphis District (W07V ENDIST MEMPHIS) - Scope of Work: - Replacement of the stringout system at EEY, divided into a base project and six options - Demolition and removal of existing steel ramps, ramp abutments, timber piles, steel pipe piles, concrete piles, and pile caps - Excavation, dredging, and disposal of materials - Installation of government-furnished steel floats and a new landing barge - Provision and installation of new steel pipe piles, steel-framed pile clusters, and donut fenders - Installation of new utilities: electrical power, lighting, lightning protection, potable water, fire water, telecom, and compressed air - Construction of a new steel connector bridge and an electrical substation (including equipment foundation) - Construction of abutment and landside approach to the connector bridge - All earthwork activities related to the connector bridge - Project Requirements: - Base project must be completed in two sequential phases to maintain ongoing EEY operations - Acquisition is unrestricted, with a HUBZone Price Evaluation Preference - Best Value Tradeoff source selection process - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Estimated Contract Value: - Between $25,000,000 and $100,000,000 - Place of Performance: - Ensley Engineer Yard, 2915 Riverport Rd, Memphis, TN 38109

Description

Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY) The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel-framed pile clusters; Providing donut fenders; Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air); Construction of a new steel connector bridge; Construction of an electrical substation, including equipment foundation; Construction of abutment and landside approach to the connector bridge; All earthwork activities for connector bridge; and all incidental related work. The base project work shall be completed sequentially from Phase 1 to Phase 2, to allow continued operation of the Ensley Engineer Yard. Phase 1 shall be completed before the start of Phase 2.For options when awarded, they they shall be completed in the sequence directed by the Government. Acquisition Strategy: The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference, using a Best Value Tradeoff source selection process. Magnitude of Construction: Between $25,000,000 and $100,000,000.

View original listing