Opportunity
SAM #N6264926Q0300
LCU-1651 Maintenance, Repair, and Replacement Services for U.S. Navy (Sasebo/Yokosuka)
Buyer
NAVSUP Fleet Logistics Center Yokosuka
Posted
April 27, 2026
Respond By
May 01, 2026
Identifier
N6264926Q0300
NAICS
336611
This opportunity from the U.S. Navy's NAVSUP Fleet Logistics Center Yokosuka seeks maintenance, repair, and replacement services for the LCU-1651 vessel, with work performed at Sasebo and Yokosuka Naval Bases in Japan. - Government Buyer: - NAVSUP Fleet Logistics Center Yokosuka (Department of the Navy, Department of Defense) - Ship Repair Facility - Japan Regional Maintenance Center (SRF-JRMC) Sasebo Detachment - SRF and JRMC Yokosuka - OEMs and Vendors Mentioned: - DRS Power and Control Technologies (Remote Push Button) - Cutler Hammer Inc. (Motor Controller) - Village Marine (Reverse Osmosis Unit) - Products and Services Requested: - Inspection and replacement of 57 Vehicle Deck Lashing Sockets (P/N: F518-1E) - Inspection and preservation of fuel tanks (Starboard 2-46-1-F and Port 2-46-2-F) - Replacement of fuel oil fill shore connection piping (12 feet of 2-inch and 2-1/2-inch IPS carbon steel piping, valves, flanges, couplings, elbows, reducers, gaskets, welding rods) - Fabrication and installation of steel mesh cover for ventilation duct (forward engine room) - Replacement of two crew berths (3-high locker type IV style 1, left and right hand), including 6 berth light fixtures with USB ports and 6 low-speed AC fans (P/N: 4715MS-12T-B20-A00) - Replacement of remote push button cable for bow ramp winch (DRS Power and Control Technologies, P/N: 6981ED174-14), motor controller (Cutler Hammer Inc., DWG 6963ED63), and electric cable (LSMSCU-7) - Installation of Village Marine PWSM-800 Reverse Osmosis Unit, cleaning and disinfection of 1,000-gallon fresh water tank, piping modifications, and potable water purity certification testing to Japanese standards - Unique or Notable Requirements: - Marine Chemist certificates and inspection reports required for fuel tank work - Potable water purity certification must meet Japanese Ministry of Health and Labor Welfare standards due to lack of EPA-certified labs in Japan - Electrical modifications to support additional fans in crew berths - Government-furnished materials for welding, insulation, and preservation - Work covers multiple ship sections: vehicle deck, engine rooms, crew living spaces, ballast tanks, and more - Period of Performance: - Most work scheduled between June and September, with some tasks extending into the following year - Place of Performance: - Sasebo Naval Base, Japan - SRF and JRMC Yokosuka, Japan - Multiple ship compartments and sections aboard LCU-1651
Description
PK1 38NBA10016, Vehicle Deck Lashing Socket; inspect and replace PK2 38NBA12312, Fuel Tank in 2-46-1-F and 2-46-2-F; inspect and preserve PK3 38NBA26108, Fuel Oil Fill Shore Connection Piping; replace PK4 38NBA51214, Mesh Cover on Ventilation Duct; replace PK5 38NBA58119, Crew Berth in 2-33-0-L; replace PK6 38NBA58405, Remote Push Button Cable for Bow Ramp Winch; replace PK7 38NBA53302, Fresh Water Tank and Piping; clean