Opportunity
SAM #N40085-26-R-9036
Paint and Flooring Repairs at Camp Lejeune Buildings FC371 and FC372
Buyer
Naval Facilities Engineering Systems Command Mid-Atlantic
Posted
April 27, 2026
Respond By
June 11, 2026
Identifier
N40085-26-R-9036
NAICS
238320, 238390, 236220, 238330, 238350, 238310
This opportunity involves major paint and flooring repairs for Buildings FC371 and FC372 at Marine Corps Base Camp Lejeune, North Carolina, managed by the Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. - Government Buyer: - Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic, Department of the Navy - Contracting office: 9324 Virginia Avenue, Norfolk, VA 23511-0395 - Project managed locally by ROICC Camp Lejeune - Scope of Work: - Paint and flooring repairs for two large buildings (FC371 and FC372) - Includes prepping, painting, and replacing flooring systems - Contractor must move furniture and minimize facility disruption during construction - Work must comply with Buy American requirements and wage determinations - Products and Quantities: - Paint: 136,903 square feet - LVT (Luxury Vinyl Tile) Flooring: 32,863 square feet - Flooring Cove Base: 8,215 linear feet - Flooring Sealer: 32,863 square feet - Interior Doors: 300 units - Exterior Doors: 123 units - Windows: 103 units - Additional materials: adhesives, mouldings, surface prep materials, polish/finish, caulking, and sealants - Paint and flooring must meet strict ASTM, MPI, and environmental standards (e.g., low VOC, slip resistance, flammability, chemical resistance) - Unique Requirements: - Only four pre-approved M&R MACC Contractors are eligible to bid - All measurements must be field-verified by the contractor - Contractor must maintain facility operations and minimize disruptions - Use of environmentally preferred paints (MPI E1 rating) is required - Flooring must meet specific ASTM standards for durability, safety, and indoor air quality - Period of Performance: - Contract completion required within 540 days after award - Place of Performance: - Marine Corps Base Camp Lejeune, North Carolina - Buildings FC371 and FC372 - Estimated Contract Value: - $10 million to $25 million
Description
Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.