Bryan Texas Utilities is seeking bids for the supply, fabrication, and delivery of spun prestressed concrete poles for the Rayburn-East Re-Route 138kV Transmission Line Project in Bryan, Texas. - Government Buyer: - Bryan Texas Utilities, City of Bryan, Purchasing Department - Products/Services Requested: - 14 spun prestressed concrete poles of various types and heights (100–130 ft), including: - RER-S-TAN, RER-S-RA10, RER-S-RA20, RERE-S-TAN, RERE-S-RA15 - Each pole includes all required inserts, step bolts, ground clips, mounting hardware, and is designed for 138kV single circuit transmission lines - Poles must comply with Entergy specification TC0609 Rev. 05 and ASTM/PCI standards - Step bolts: 3/4" or 5/8" diameter, A394 grade, with specified placement and galvanized/non-corrosive inserts - Unique/Notable Requirements: - Compliance with Entergy's technical standards for centrifugally cast (spun) prestressed concrete poles - Detailed quality assurance, testing, and inspection protocols - Delivery to staked locations as specified by the project - All necessary hardware for assembly and erection must be included - Delivery and completion required within a 12-month contract term - OEMs and Vendors: - No specific OEMs named; open to any qualified manufacturer of spun prestressed concrete poles meeting the technical and quality requirements - Locations: - Delivery at staked locations for the Rayburn-East Re-Route 138kV Transmission Line Project in Bryan, Texas - Contracting office: Bryan Texas Utilities Purchasing Department, 2611 N Earl Rudder Fwy, Bryan, TX 77803

Description

This solicitation is a Request for Bid (RFB No. 025-07-26) issued by Bryan Texas Utilities for the purchase of spun prestressed concrete poles for the Rayburn-East reroute project. The procurement includes design, material, fabrication, testing, inspection, and delivery of poles for use on Entergy system transmission lines. Bids are to be submitted electronically or as sealed hard copies by May 27, 2026, with a question cutoff date of May 13, 2026. The bid process includes detailed technical specifications and structure drawings as attachments.

View original listing