Opportunity

Lee's Summit City Government #1104

Construction of 300,000-Gallon Sanitary Excess Flow Holding Basin in Lee's Summit, MO

Posted

March 12, 2026

Respond By

April 29, 2026

Identifier

1104

NAICS

237110, 237990

The City of Lee's Summit, Missouri, is seeking bids for the construction of a 300,000-gallon sanitary excess flow holding basin at the Winnebago site near Highway 150 and Highway 291. - Government Buyer: - City of Lee's Summit, Public Works - Engineering Division - Project Scope: - Construction of a 300,000-gallon earthen sanitary excess flow holding basin - Installation of diversion structure, flow meter vault, associated piping, and appurtenances - Site improvements including sanitary sewer (gravity) installation, electrical and controls work, control panel installation or replacement, fittings and valves, erosion control, slope and bank stabilization, fencing, landscaping (including seeding), water diversion structures, paving (asphalt or concrete), guardrails, sewer and water construction, sitework, excavation, drainage, instrumentation, precast and formed concrete work, crushed stone/rip rap, and pump or pump station installation - Geotechnical consulting services already performed, including drilling, soil testing, and recommendations for basin liner and slope stability - Products/Services Requested: - Major construction materials: control panels, fittings, valves, fencing, guardrails, landscaping materials, paving materials, pumps, precast and formed concrete, crushed stone/rip rap - Services: sitework, excavation, grading, sanitary sewer construction, electrical and controls installation, erosion control, landscaping, stormwater improvements, geotechnical consulting - Unique/Notable Requirements: - Compliance with prevailing wage laws and Missouri tax exemption - Mandatory use of specific bid forms and submission of subcontractor/manufacturer/supplier lists - Non-collusion affidavits and proof of enrollment in a federal work authorization program (e.g., E-Verify) - OSHA-approved safety training for all on-site employees - Technical specifications for sensor cable splicing and transmitter power/mounting - Basin liner must be clay modified with bentonite to meet permeability standards - No specific OEMs or vendors are named in the solicitation or attachments

Description

This solicitation is for the installation of a 300,000 gallon earthen sanitary excess flow holding basin, including a diversion structure, flow meter vault, piping, appurtenances, and site improvements. The project is located in Lees Summit, Missouri, and involves various construction activities such as sanitary sewer work, electrical installation, erosion control, landscaping, paving, and stormwater improvements. Bids are to be submitted electronically via QuestCDN by April 29, 2026, with a pre-bid meeting scheduled for March 19, 2026. The project requires compliance with prevailing wage laws and includes detailed bidding procedures and safety training requirements.

View original listing