Opportunity
SAM #N62473-26-R-J503
Award for Parking Lot Repair at NAS Lemoore, CA Using Full Depth Recycling
Buyer
NAVFAC Southwest
Posted
April 25, 2026
Identifier
N62473-26-R-J503
NAICS
237310, 237990, 238990
This award notice details the selection of COMMAND PERFORMANCE CONSTRUCTORS INC by the Naval Facilities Engineering Command Southwest (NAVFAC SW), Department of the Navy, for a parking lot repair project at NAS Lemoore, California. - Government Buyer: - Naval Facilities Engineering Command Southwest (NAVFAC SW), Department of the Navy - Awarded Vendor: - COMMAND PERFORMANCE CONSTRUCTORS INC - Scope of Work: - Repair and repave the parking lot at Building 852, Unaccompanied Housing #7, NAS Lemoore - Use Full Depth Recycling method for pavement restoration - Install new non-reflective thermoplastic striping - Provide new handicapped signage and poles - Install new concrete parking bumpers - Add new xeriscape cobbles - Conduct pavement survey to ensure proper drainage - Utilize all recycled materials (grinding, milled, and pulverized) to correct low spots - Dispose of remaining recycled and waste materials at an off-base facility - Requirements: - All work must comply with project drawings and specifications - No specific OEMs, part numbers, or proprietary products are identified in this opportunity - Place of Performance: - Naval Air Station Lemoore, Lemoore, CA - Contracting Office: - NAVFACSYSCOM SOUTHWEST, San Diego, CA
Description
For Building 852, Unaccompanied Housing #7, at NAS Lemoore, CA
The project requires repaving the Parking Lot using the Full Depth Recycling method. This includes new non-reflective thermoplastic striping, new handicapped signage and poles, new concrete parking bumpers, and new xeriscape cobbles—all in accordance with the project drawings and specifications.
The Contractor must conduct a pavement survey to ensure proper drainage. The Contractor is responsible for utilizing all recycled materials, including grinding, milled, and pulverized materials, to correct low spots and ensure proper drainage. Additionally, the Contractor must dispose of any remaining recycled materials, waste materials, and debris from the project site to a disposal facility located outside the Naval Air Station Lemoore Base.