Opportunity
Merx #RFQ126001030
Supply and Delivery of 60 Ft Modular Panel Bridge with Steel Decking for Newfoundland and Labrador
Posted
April 23, 2026
Respond By
May 07, 2026
Identifier
RFQ126001030
NAICS
332312, 332999
This opportunity seeks the supply and delivery of a single 60-foot modular panel bridge with steel decking for the Department of Forestry, Agriculture and Lands in Newfoundland and Labrador. - Government Buyer: - Public Procurement Agency, on behalf of the Department of Forestry, Agriculture and Lands (GNL) - Products Requested: - One (1) pre-engineered, prefabricated single-story modular steel vehicular panel bridge superstructure - Includes base plates and four end posts - Steel decking required - No substitutions permitted - Must meet CL-625 loading per CAN/CSA-S6-19 - Minimum clear roadway width: 4.14 meters - Fabricated from new, unused structural steel (CAN/CSA-G40.21 or ASTM A709) - Hot-dipped galvanized finish - All components and hardware included - Unique/Notable Requirements: - Delivery required FOB destination to 1 Agricultural Road, TCH, Pynn's Brook, NL, A0L 1K0, within ten weeks of award - Supplier must provide: - Stamped engineering drawings, design information, shop drawings, and design calculations - Itemized list of all components - Up-to-date certification from the Canadian Welding Bureau (CWB) - Third-party certification from the Canadian Institute of Steel Construction (CISC) - Demonstrated experience: at least five similar bridges designed and constructed in Newfoundland and Labrador in the past three years - OEMs and Vendors: - No specific OEMs or brands are named in the solicitation - Evaluation: - Award based on lowest total lump sum price (excluding HST) - Pricing in Canadian dollars
Description
This solicitation is for the supply and delivery of one 60-foot modular panel bridge with steel decking for the Department of Forestry, Agriculture and Lands in Newfoundland and Labrador, Canada. The bridge is a pre-engineered, prefabricated single-story modular steel vehicular panel bridge superstructure, including base plates and four end posts. The delivery must be FOB destination to the specified department address and completed within ten weeks from the date of award. The bridge must meet specific design criteria, material standards, and include detailed submittals such as drawings and design calculations.