Opportunity
Needles Planetbids #PW2611
Route 66 Monument Sign Design, Fabrication, and Installation for City of Needles, CA
Posted
April 22, 2026
Respond By
May 08, 2026
Identifier
PW2611
NAICS
339950, 238990, 238210
The City of Needles, California is seeking qualified contractors to design, fabricate, and install a Route 66 themed shield drive-through monument sign in downtown Needles. - Government Buyer: - City of Needles, California - Scope of Work: - Design, fabrication, and installation of a Route 66 themed shield monument sign - Includes lighting and electrical wiring ready for connection - Sign must be durable, visually appealing, and serve as a landmark with vehicle pass-through and photo opportunities - Contractor responsible for obtaining encroachment permit - Must comply with California prevailing wage laws and public works contractor registration - One-year warranty on materials and workmanship required - Products/Services Requested: - Design services for monument sign - Fabrication of sign structure - Installation at designated downtown location - Electrical/lighting provision and installation - Notable Requirements: - No specific OEMs mandated; open to all qualified vendors - Electronic bid submission required - Bid bond, non-collusion declaration, references, and list of subcontractors required - Liquidated damages of $500 per day for late completion - Alternative designs are welcome if they meet project intent - Place of Performance: - Needles City Hall and downtown Needles, CA (817 Third Street, Needles, CA 92363)
Description
The City of Needles, California is seeking proposals from qualified contractors, fabricators, and sign manufacturers for the design, fabrication, and installation of a Route 66 themed shield drive-through monument sign. The structure is intended to be durable, visually appealing, and serve as a landmark with vehicle pass-through and photo opportunities. The sign will include lighting with wiring and be ready for connection to new service provided by the City of Needles. The project must be fully installed by October 31, 2026, and liquidated damages of $500 per day apply for delays.