Opportunity

Kern High School District Planet bids #7044

Kern High School District Solicits Bids for Modular Classrooms and Restroom Installation at Bakersfield High School

Posted

April 01, 2026

Respond By

April 28, 2026

Identifier

7044

NAICS

236220, 238290, 238210, 238220

Kern High School District is seeking bids for a modular construction project at Bakersfield High School: - Government Buyer: - Kern High School District, Business Services Department and Facilities Planning Department - Project Scope: - Placement of ten (10) temporary 24’ x 40’ DSA pre-checked relocatable classroom buildings - Installation of one (1) permanent 12’ x 24’ DSA pre-checked relocatable restroom building - Associated site work: landings, ramps, power, data, conduit, boxes, and utility verification - Installation of three owner-furnished shade structures and one owner-furnished drinking fountain - Inclusion of fire alarm systems, HVAC units, electrical panels, lighting fixtures, plumbing fixtures, concrete and wood foundations, structural steel and wood framing, roofing systems, and accessibility signage/hardware - Notable Requirements: - Compliance with 2022 California Building Code, Title 24, seismic, energy, and fire safety codes - Prevailing wage, payment and performance bonds, insurance, and California DIR registration - Contractor prequalification and specific license requirements (B and C8) - Project duration: 60 calendar days - OEMs and Vendors: - No specific OEMs named in the documents - Prospective modular building vendors include American Modular Systems, Global Modular, iMod Systems, and NextMod, Inc. - Estimated Contract Value: - Approximately $1,100,000 - Place of Performance: - Bakersfield High School, 1241 G Street, Bakersfield, CA

Description

This solicitation is for the placement of ten temporary 24’ x 40’ DSA pre-checked classroom buildings and one permanent 12’ x 24’ DSA pre-checked relocatable restroom building at Bakersfield High School. The work includes landings, ramps, power, data, and site work as required, as well as installation of three owner furnished shade structures, one drinking fountain, new power/data conduit and boxes, and associated site work. Contractors must verify utilities do not conflict with shade structure footings. The project requires licenses B and C8 and has a duration of 60 calendar days with an estimated value of $1,100,000.

View original listing