Imperial Irrigation District Planet bids #SRFP 541
IID Bombay Beach Vegetation Project: Dust Control, Irrigation, and Site Improvements at Salton Sea
Posted
April 23, 2026
Respond By
June 11, 2026
Identifier
SRFP 541
NAICS
237110, 221310, 237990
This opportunity involves the Imperial Irrigation District (IID) seeking qualified contractors for the Bombay Beach Vegetation Project at the Salton Sea, focused on dust control, irrigation, and site improvements. - Government Buyer: - Imperial Irrigation District (IID) - OEMs and Vendors Mentioned: - Snyder (Snyder 7420100W99803 poly tanks) - WISECONN (DROP CONTROL automation controller) - Nelson (100 Series Valves) - Netafim (360CT2PG.1 Ultrasonic Flow Meter, 65ARIB2PP Combination Air Vent, Series 75 Valves) - Grundfos (CRFLEX 5-6 Booster Pump) - AMIAD (Mini-Sigma Automatic Screen Filter) - Products and Quantities: - Pre-cast concrete barriers (869 units) - Sand fencing with 8' posts (5,375 linear feet) - Sand fencing with 10' posts (4,620 linear feet) - Utility gates (3 units) - Snyder 5,000-gallon poly tanks (3 units, part number 7420100W99803) - HDPE mainlines: 2" (150 LF), 3" (2,335 LF), 4" (1,910 LF) - Booster pump package (Grundfos CRFLEX 5-6 or equivalent) - Solar arrays and battery backup (1 system) - Chlorine water treatment systems (3 units) - Acid water treatment system (1 unit) - In-field drip irrigation system (65 acres) - Irrigation automation system (WISECONN DROP CONTROL or equivalent, 65 acres) - Netafim ultrasonic flow meters (2 units, part number 360CT2PG.1) - Nelson 100 Series and Netafim Series 75 valves - AMIAD Mini-Sigma automatic screen filter - Stainless steel, HDPE, and PVC piping and fittings - Chain link fencing and gates - Services Requested: - Mobilization, project management, environmental protection, site surveying, record drawings, compaction testing - Construction of stormwater diversion berms (2,350 LF), drainage swales (953 LF), bunds (30 units), gravel pads (33,000 SF), access roads (over 30,000 LF) - Seedbed preparation and seeding (48 acres) - Irrigation system commissioning (16 events) - Optional: subgrade stabilization, temporary water blending system rental/removal, hydrant water source extension, debris dispersal - Unique/Notable Requirements: - Mandatory valid California Type "A" Contractor’s License plus C-10, C-61/D-21, and C-34 - Strict safety, environmental, and documentation standards - Prevailing wage compliance - Detailed as-built survey deliverables - Mandatory pre-bid meeting and jobwalk - Locations: - Place of performance: Bombay Beach, eastern shore of the Salton Sea, Imperial County, CA - Government facility: Imperial Irrigation District office, Imperial, CA
Description
The Imperial Irrigation District (IID) is soliciting proposals for the Bombay Beach Vegetation Project, which involves implementing a dust control plot on a portion of the Bombay Beach Playa at the eastern shore of the Salton Sea. The scope includes procuring and installing site access control features, constructing stormwater management and surface water catchment features, installing and commissioning an irrigation system, and seedbed preparation and seeding. The project requires contractors to have specific California Contractor's Licenses and mandates a mandatory pre-bid meeting and jobwalk. Responses must be submitted in paper format by June 11, 2026.