Opportunity
SAM #W912DY-26-Q-A124
Industrial Storage and Furniture Procurement & Installation at Kirtland AFB, Building 20602
Buyer
USACE Engineering Support Center Huntsville
Posted
April 23, 2026
Respond By
May 26, 2026
Identifier
W912DY-26-Q-A124
NAICS
238390, 423210, 337214, 337215, 337127
This opportunity involves the procurement and installation of industrial storage and workbench furniture for renovations at Kirtland Air Force Base, Building 20602, managed by the U.S. Army Corps of Engineers, Huntsville Center (Furniture Team). - Government Buyer: - U.S. Army Corps of Engineers, Huntsville Center (CEHNC), KO Contracting Division, Redstone Arsenal - OEMs and Vendors: - No specific OEMs or manufacturers are named in the solicitation or attachments; products are specified generically by type and technical requirements - Products Requested: - Industrial, Ventilated Storage Cabinet, Metal (part number SN03): 9 units total - Industrial, Clear-View Storage Cabinet, Metal (SN04): 28 units total - Closed Industrial Storage Shelving, Metal (SN05): 8 units total - Pallet Rack, Metal Wire Decking (SN06): 8 units total - Mobile Charging Storage Cabinet, Metal (SN07): 15 units total - Deluxe Work Bench, Metal (TN01): 6 units total - Mobile Cabinet Work Bench, Metal (TN02): 10 units total - Clear-View, Preservation Storage Cabinet, Metal (SN08): 4 units total - 4-Drawer Flat File, Double-High, Metal (SX01): 9 units total - 6-Drawer Flat File, Double-High, Metal (SX02): 3 units total - Plaque Storage, Metal (SX03): 9 units total - Stainless Steel Work Table, Height Adjustable (TX01): 9 units total - Services Requested: - Installation of all furniture and equipment - Shipping (CONUS/OCONUS and secure options) - Electrical hardwiring by licensed electrician - Removal and disposal or relocation of existing furniture - Oversight of delivery and offloading - Submission of safety plans, technical documentation, and warranties - Unique or Notable Requirements: - All items must meet detailed technical specifications (e.g., gauge of steel, locking mechanisms, powder coat finish, adjustable shelves) - Contractor must coordinate delivery, installation, and electrical work, and comply with safety and security requirements - Post-award site verification and finish selection required - Storage options for up to six months may be exercised - Opportunity is a 100% Small Business Set Aside
Description
Greetings from the Corps of Engineers, Huntsville Center, Furniture Team.
Please find the attached Request for Quote (RFQ) # W912DY-26-Q-A124, to procure and install industrial storage for Kirtland AFB, Bldg 20602. THIS RFQ IS A 100% SMALL BUSINESS SET ASIDE. Quotations from other than small business will not be considered.
This RFQ includes a Standard Form 1449 (SF1449), an Excel version of Attachment #1, and a Word version of Attachment #8.
QUOTES SHALL BE SUBMITTED ACCORDING TO THE FOLLOWING PROCEDURES NO LATER THAN 1400 CST 26 May 2026 (30 days). This closing date/time is mandatory despite anything potentially to the contrary in block 10 of the SF 1449 or on eBuy (if used). Please submit quotes valid for 120 days.
PLEASE SUBMIT QUESTIONS in email by 30 April 2026, 1200 CST to jessica.sizemore@usace.army.mil AND anthony.L.patterson@usace.army.mil.
To help you submit a complete quote for consideration, please follow all of the steps below:
1.Quotes shall be emailed to the Contract Specialist at jessica.sizemore@usace.army.mil AND CEHNC-FurnitureQuotes@usace.army.mil by the closing date and time.
2.Quotes shall include no less than the following documents: A.SF1449, and amendments (if applicable) B.Excel version of Attachment 1 C.Word version of Attachment 8 D.Access information to an FTP upload (if applicable). Note: When an FTP site is used to submit your quote, the vendor shall email the Contract Specialist. A password sent by/from an FTP site does not satisfy the vendor’s requirement to email the Contract Specialist the above documents.
3.The subject line of emailed quotes, and notifications of additional quote documents located onan FTP site, shall include: A.Company name B.RFQ number C.Project name & building(s) D.Number of emails Example: GreatFurniture_W912DY-18-T-0140_Ft. Bragg_Bldg 1500_Email 1 of 5
4.Complete the SF1449 with your Company name and signature in Block 17a.
5.Complete the SF1449, Item NO. (CLINS) with Unit Prices and the Extended Amounts. Pricing onSF1449 must match pricing on Attachment 1.
6.Complete the SF1449, Instructions To Quoters section to show installation start and completiondates.
7.Complete the SF1449, Instructions To Quoters section with your company GSA #, Tax ID #, CageCode and Point-of-Contact information.
8.Submit a Technical Data Sheet (spec sheet / cut sheet) for each item in your quote. Make clearon the Technical Data Sheet which line item is being met.
9.Submit Technical Data Sheets that are organized and sequential as described in the SF1449,Instructions To Quoters section.
10.Pre-award questions shall be directed to the Contract Specialist. The contractor shall notdiscuss any aspect of the procurement, to include asking questions, with the onsite TechnicalRepresentative (TR) prior to contract award.
11.You may either email your quote (up to 10MB each) or use an FTP site to store your quote andemail the Contract Specialist according to Items 2 and 3. In case of an error received duringquote submission, first consider dividing a file into two parts and resending or posting. Also, youmay contact the Contract Specialist for potential guidance. Huntsville Center’s inboxesautomatically archive to keep free space available at all times; however, the capacity of serversvaries depending on digital traffic. The vendor is responsible for delivering a complete andtimely quote to the Contract Specialist under all circumstances.
12.It is recommended that Contractors use the Procurement Integrated Enterprise Environment(PIEE). A vendor portal for solicitations was introduced as an enterprise-level service for theDepartment of Defense (DoD) within the Procurement Integrated Enterprise Environment (PIEE)platform. This capability allows DoD to have a more automated and secure process for capturingsolicitations and their attachments and responses from industry. To obtain additional informationplease visit: https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml i. PIEE Size Limit. Each uploaded attachment can be up to 1.9 gigabytes (GB) in size. Theapplication supports different file extensions. ii. Notifications when an amendment to the solicitation is posted: Within a solicitation, click thecheckbox next to ‘Please notify me of amendments to this solicitation’ on the top left corner ofthe screen. You will receive email and system notification when an amendment is posted. iii. Upload Multiple Documents in PIEE, multiple attachments may be uploaded at one time. Afteryou click ‘Choose File,’ highlight all the files you want to upload and click ‘Open.’ If the totalsize of all the attachments exceeds 1.9GB (see 4.A above), upload the multiple attachments inbatches that keeps each batch under the 1.9GB limit. Please contact your company’s AccountAdministrator for any account related issues. If you are experiencing technical problems withProcurement Integrated Enterprise Environment, please contact the DISA DECC OgdenElectronic Business Service Desk at link below:https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml
13.Return Attachment 1 in Excel format. Fill-in ALL blank spaces and return the attached ExcelSpreadsheet version of Attachment 1 – DO NOT LEAVE ANY LINE ITEMS BLANK. If you choose tonot charge for an item, please enter $0.00 beside that item.
14.Return Attachment 8 in Word format. Complete Attachment 8, Technical Documents Checklist,and return in Word format with your quote.
15.File names shall include your company name in the first position and the submission date inthe last position, as shown in the following examples: GreatFurniture_SF1449, Amend 1_20Feb18.pdf GreatFurniture_Attachment 1_20 Feb18.xls GreatFurniture_Attachment 8_20 Feb18.docx GreatFurniture_Tech Data 1-12_20 Feb18.pdf GreatFurniture_Tech Data 13-24_20 Feb18.pdf
We would like our RFQ process to be clear and helpful. If you have suggestions, please bring them to our attention. The responsibility of providing a complete, accurate, and timely quote is yours. These instructions should help to make your quote complete.