Opportunity
Brazos Valley Ionwave #018-07-26 Addendum 2
Reconstruction of Shady Lane Substation for Bryan Texas Utilities
Posted
April 15, 2026
Respond By
June 02, 2026
Identifier
018-07-26 Addendum 2
NAICS
237130, 237990
Bryan Texas Utilities is seeking bids for the comprehensive reconstruction of the Shady Lane Substation in College Station, Texas. - Government Buyer: - Bryan Texas Utilities (local government utility) - OEMs and Engineering Firms: - Burns & McDonnell Engineering Company, Inc. (referenced in documentation) - Products and Equipment Requested: - Electrical substation equipment (transformers, circuit breakers, buswork, hardware for 69kV substation) - Steel monopoles and structural components - Underground duct banks and conduit - Grounding and protection equipment (ground grid, surge arresters, protection relays) - Fencing and site security materials - Services Requested: - Demolition and site preparation (including hazardous materials abatement such as lead paint) - Civil and structural construction (earthwork, foundation removal/replacement, grading, concrete work) - Electrical installation (equipment, wiring, conduit, protection/control systems) - Testing and commissioning (system testing, commissioning, site restoration) - Unique/Notable Requirements: - Mandatory pre-bid meeting and site visit - Coordination with existing utilities - Compliance with safety and environmental regulations - Adherence to detailed engineering specifications and construction drawings - Restoration of all disturbed areas after construction - Project Location: - Shady Lane Substation, College Station, Texas
Description
This solicitation is for the reconstruction of the Shady Lane Substation located in College Station, Texas. The project includes demolition of existing features, installation of new electrical substation equipment, underground duct banks, conduit installation, and protection and control systems. A mandatory pre-bid meeting and site visit are scheduled for April 28, 2026, with electronic bids due by June 2, 2026. The work involves coordination with existing utilities and adherence to safety and environmental regulations.