Opportunity

Brazos Valley Ionwave #024-07-25

Bryan Texas Utilities solicits bids for construction of Brushy Creek Substation and supply of major OEM equipment

Posted

April 23, 2026

Respond By

May 20, 2026

Identifier

024-07-25

NAICS

237130, 238210, 238190

Bryan Texas Utilities is seeking bids for the construction of the Brushy Creek Substation in College Station, Texas, covering all civil, structural, and protection and control work for a new 138kV electrical substation. - Government Buyer: - Bryan Texas Utilities (BTU) - OEMs and Vendors: - Siemens (SPS2S-145-40-1 circuit breakers) - Schweitzer Engineering Laboratories (SEL-411L, SEL-421, SEL-2814 relays and transceivers) - General Electric (GE EB25B12, EB27B04S terminal blocks) - FS (fiber optic patch cables) - Products and Services Requested: - Major substation equipment: 138kV gas circuit breakers, protection relays, fiber optic communications, terminal blocks, armored fiber patch cables - Structural steel fabrication: bus switch stands, distribution A-frame, shield wire masts, yard lights, and associated foundations - Civil construction: site preparation, grading, foundation installation, drainage, access road construction - Structural construction: steel structure erection, control building, installation of substation equipment - Protection and control system installation: commissioning of relays, SCADA, and communications systems - Product Line Items (with part numbers and quantities): - Siemens SPS2S-145-40-1 138kV Circuit Breaker (6 units) - SEL-411L Differential Relay - SEL-421 Distance Relay - SEL-2814 Fiber Optic Transceiver (1 unit) - GE EB25B12 Terminal Block (17 units) - GE EB27B04S Shorting Terminal Block (4 units) - FS Duplex 9/125 Multimode Armored Fiber Patch Cable - FS Duplex 9/125 Single Mode Armored Fiber Patch Cable - Structural steel items: 138KV 1-PH LOW BUS SUPPORT (24), 138KV 3-PH LOW BUS SWITCH STAND (22), 138KV 3-PH HIGH BUS SWITCH STAND (22), 138KV 3-PH LOW BUS FUTURE SWITCH STAND (4), 138KV 3-PH HIGH BUS FUTURE SWITCH STAND (2), 138KV 1-PH LOW BUS PT STAND (3), 138KV 1-PH CT/PT STAND (3), 15KV 3-PH STRAIN BUS STRUCTURE (2), 15KV 3-PH LOW BUS SWITCH STAND (1), 15KV 6-BAY DISTRIBUTION A-FRAME (1), SHIELD WIRE MAST (1), YARD LIGHT (10), SHIELD MAST (1) - Unique or Notable Requirements: - Strict adherence to specified OEM part numbers for critical components (no substitutions allowed for GE terminal blocks, SEL relays) - Mandatory pre-bid meeting and site visit - Compliance with detailed foundation and civil engineering standards - Contractor must provide all materials and labor for a complete and operational substation - Place of Performance: - Brushy Creek Substation, College Station, Texas - Bryan Texas Utilities, Bryan, Texas

Description

This solicitation is a request for bid issued by Bryan Texas Utilities (BTU) for the construction of the Brushy Creek Substation. The project involves construction activities at the Brushy Creek Substation site located in College Station, Texas. A mandatory pre-bid meeting and site visit are scheduled to provide prospective bidders with detailed information about the project. Electronic bids must be submitted by 2:00 PM CST on May 20, 2026. The solicitation includes detailed bid documents and multiple appendices covering physical structural, site civil, and other technical specifications.

View original listing