Opportunity

San Diego County Regional Airport Authority PlanetBids #104314B

Construction of Terminal 2 East Lounge Expansion (Core & Shell Only) at San Diego International Airport

Posted

April 21, 2026

Respond By

May 21, 2026

Identifier

104314B

NAICS

236220

This opportunity involves the construction of a new core and shell building addition at San Diego International Airport's Terminal 2 East: - Government Buyer: - San Diego County Regional Airport Authority - Project Scope: - Construction of an elevated, 1-story, 8,200 sq ft core and shell building addition at the Terminal 2 East concourse level - Includes fireproof-encapsulated steel structure, metal panel and curtainwall glazing exterior, and PVC roofing to match adjacent construction - Construction of a new open-air egress stair and removal/replacement of an existing adjacent egress stair - Pavement replacement at apron level, restriping, and new signage - Installation of all necessary building systems: sewer, grease line, water, electrical power, low-voltage technology (IT/Security), lighting, fire sprinklers, fire alarm, and rooftop mechanical systems - Unique/Notable Requirements: - Strict compliance with California prevailing wage and labor regulations - Contractor must hold a valid California Class B license and be registered with the California Department of Industrial Relations - Owner Controlled Insurance Program (OCIP) provided - Comprehensive quality control, BIM/VD&C implementation, stormwater management, and environmental/safety compliance required - Liquidated damages for schedule delays; night work (11 PM–5 AM) may be required - Electronic bid submission and adherence to detailed construction safety and scheduling guidelines - No specific OEMs or vendors are named in the solicitation documents - Estimated contract value: $17,900,000

Description

This solicitation is for the construction of an elevated, 1-story, 8,200 square foot core and shell building addition at the concourse level of Terminal 2 East. The addition will accommodate the future expansion of the existing Lounge (by others) and will include fireproof-encapsulated steel members, a metal panel and curtainwall glazing exterior envelope, and a PVC roof matching adjacent construction. The project also involves constructing a new open-air egress stair from the concourse to the apron level, removing and replacing one existing adjacent open-air egress stair, pavement replacement at the apron level, restriping, and signage. The work encompasses all necessary services and appurtenances including sewer, grease line, water, electrical power, low-voltage technology (IT/Security), lighting, fire sprinklers, fire alarm, and rooftop mechanical systems.

View original listing