Opportunity
EPCOR Canada Bidsandtenders #203575 - PART A - Confidentiality Agreement
Inspection and Engineering Assessment of Underground High-Voltage Transmission River Crossings for EPCOR
Posted
April 23, 2026
Respond By
May 20, 2026
Identifier
203575 - PART A - Confidentiality Agreement
NAICS
541330, 237130, 237990
EPCOR Distribution & Transmission (EDTI) is soliciting proposals for a comprehensive assessment of underground high-voltage transmission river crossings in Edmonton, Alberta. - Government Buyer: - EPCOR Distribution & Transmission (EDTI) - Scope of Work: - Inspection, survey, and engineering assessment of multiple high-voltage underground transmission river crossings - Focus on high-pressure fluid-filled (HPFF) cable systems housed in pressurized steel pipes beneath the North Saskatchewan River - Evaluation of asset integrity, stability, and protection to ensure system reliability - Risk mitigation for mechanical damage, soil erosion, and fluid leaks - Products/Services Requested: - Comprehensive inspection, survey, and engineering assessment services (no specific products or part numbers listed) - Unique Requirements: - Access to full bid package requires signing and submitting a Confidentiality Agreement - No specific OEMs or vendors are named in the solicitation - Contract duration is 60 months - Place of performance is Edmonton, Alberta, specifically the North Saskatchewan River crossings
Description
EPCOR Distribution & Transmission (EDTI) is seeking a qualified proponent to perform a comprehensive inspection, survey, and engineering assessment of multiple high-voltage underground transmission river crossings that use high-pressure fluid-filled (HPFF) cable systems. These cables run through pressurized steel pipes beneath the North Saskatchewan River at several locations across Edmonton. The work aims to maintain the integrity, stability, and protection of these assets to ensure system reliability and mitigate risks such as mechanical damage, soil erosion, and potential fluid leaks. Access to the full bid package requires signing and submitting a Confidentiality Agreement.