The City of Arlington, Texas, is seeking bids for a major public works construction project to improve drainage, water, and sanitary sewer infrastructure across several city roadways. - Government Buyer: - City of Arlington, Public Works Department - Office of the Director of Public Works - Project Scope: - Ditch grading and unclassified ditch excavation (5,491 cubic yards) - Installation of approximately 3,500 linear feet of storm sewer (≤36") - Replacement of driveway culverts (15", 18", 24" reinforced concrete pipe) - Water line replacement (including 400 LF of 12" PVC C-900 DR-18, 29 LF of 6" PVC C-900 DR-18) - Sanitary sewer line replacement (498 LF of 8" PVC, 17 LF of 4" service with cleanout, 1 manhole) - Asphalt paving (4,311 square yards) and pavement repair - Concrete sidewalk and curb/gutter repair - Installation of fire hydrant and gate valves - Erosion control devices (silt fences, rock check dams, drop inlet protection, rock berms) - Traffic control plan implementation (maintaining two-way traffic at all times) - CCTV inspection of storm sewer lines (requires professional liability insurance) - Notable Requirements: - Prime and all subcontractors must be prequalified with the Public Works Department - Strict insurance requirements, including umbrella, pollution, and professional liability for CCTV work - Mandatory shop drawing/product data submittals - Adherence to prevailing wage rates - No road closures permitted; two-way traffic must be maintained - Bonds required (bid, performance, payment, and two-year maintenance) - OEMs and Vendors: - No specific OEMs or vendors are named in the documents - Estimated Contract Value: - $6,009,000 - All plans and specifications are available via the City's IonWave procurement portal.
Description
This project primarily consists of earthwork and storm sewer replacement along six roadways including Dan Gould Drive, Wood Lane, Bell Street, Waterview Drive, Chaperito Trail, and Jewell Drive. The scope includes ditch grading, driveway culvert replacements, water line replacement on Bell Street, and water and sanitary sewer replacement on Waterview Drive. The project requires the prime contractor to be prequalified with the Public Works Department in storm sewer prior to bid opening. A pre-bid meeting/teleconference is scheduled to discuss the scope of work, which is not mandatory but encouraged for prospective bidders.