Opportunity

Alberta Purchasing #CVR-2026-010

County of Vermilion River Bridge Culvert Supply and Installation Solicitation

Posted

April 22, 2026

Respond By

May 14, 2026

Identifier

CVR-2026-010

NAICS

237310, 237990

This opportunity involves the County of Vermilion River, Alberta, seeking bids for a heavy construction project to supply and install two new bridge culvert structures. - Government Buyer: - County of Vermilion River, Alberta - Products/Services Requested: - Supply and installation of a 3.00 m diameter CSP (corrugated steel pipe) culvert by 41.5 m invert length for Bridge File 01640 - Supply and installation of a 2.40 m diameter CSP culvert by 28.5 m invert length for Bridge File 78828 - Associated construction services: traffic accommodation, site isolation, turbidity monitoring, fish capture and release, demolition and disposal of existing bridge structures, excavation with geotextile filter fabric, culvert assembly, backfill and material testing, crushed aggregate and clay seals, concrete end treatment (including testing and a small bridge plaque for BF 01640), heavy rock riprap erosion protection, roadway work, and permanent environmental protection devices - Unique/Notable Requirements: - All work must comply with Design Drawings and Section 18 of the Standard Specifications for Bridge Construction - Environmental protection measures and fish handling are required - Concrete end treatment and bridge plaque for one structure - No specific OEMs or vendors are named in the solicitation

Description

This solicitation is for the supply and installation of two new bridge culvert structures in the County of Vermilion River, Alberta. The work includes installing a 3.00 m diameter CSP culvert by 41.5 m invert length for Bridge File 01640 and a 2.40 m diameter CSP culvert by 28.5 m invert length for Bridge File 78828. The scope covers traffic accommodation, site isolation, demolition, excavation, supply and assembly of culvert materials, backfill, concrete end treatment, erosion protection, roadway work, and permanent environmental protection devices. The project must comply with the Design Drawings and Section 18 of the Standard Specifications for Bridge Construction.

View original listing