Opportunity

West Des Moines Ionwave #0510-030-2023 Addendum 1

Grand Avenue Widening and Traffic Signal Installation – City of West Des Moines

Posted

April 21, 2026

Respond By

May 06, 2026

Identifier

0510-030-2023 Addendum 1

NAICS

237310, 237110, 237990, 238910

The City of West Des Moines is seeking bids for the Grand Avenue Widening project, spanning from South Jordan Creek Parkway to South 60th Street. - Government Buyer: - City of West Des Moines, City Clerk’s Office - Scope of Work: - Major roadway widening and reconstruction, including: - Approximately 12,500 cubic yards of grading and subgrade preparation - Over 19,800 square yards of 9-inch reinforced Portland Cement Concrete (PCC) paving - Full-depth PCC patching, curb and gutter, and concrete median installation - Storm sewer modifications (including installation and removal of various sizes of reinforced concrete pipe) - Water main appurtenances, fire hydrant assemblies, and valve box work - Sidewalk and detectable warning panel installation - Pavement markings (painted and removable tape), symbols, and legends - Landscaping, erosion control, and site restoration - Installation of digital enterprise conduit infrastructure (multiple sizes and colors of HDPE conduit, 7-way multi-duct, and large vaults) - Permanent traffic signals at three intersections, including: - Traffic signal heads (LED, Dialight or Leotek) - Pedestrian signals with countdown displays - Polara Engineering APS pedestrian push buttons - Steel mast arm poles (Valmont Industries or Millerbernd Manufacturing) - Fiber optic cable (Corning) - Managed Ethernet switches (EtherWan) - Vehicle detection system (NoTraffic Video/Radar) - Emergency vehicle preemption (Opticom) - Battery backup (Clary SP1250) - Street light luminaires (LED) - Traffic monitor system (Axis Q6075e-E PTZ Dome Camera) - Unique/Notable Requirements: - All electrical equipment and materials must be new and certified to NEMA, NEC, ASTM, ASA, and UL standards - Level II IMSA Traffic Signal Technician Certification required for signal work - Preference for Iowa-grown products and labor - Performance and payment bonds (100% of contract price) and a four-year maintenance guarantee - Shop drawings and catalog cuts required for steel mast arm poles and standard items - Compliance with Iowa DOT and SUDAS specifications - Strict completion deadlines with liquidated damages for delays - Submission of Bidder Status Form - No specific OEM part numbers for most construction materials, but named OEMs for traffic signal and ITS components - Estimated quantities for major items and detailed line items for all work components

Description

This solicitation is a Request for Bid issued by the City of West Des Moines for the Grand Avenue Widening project from South Jordan Creek Parkway to South 60th Street. The project involves furnishing all labor, equipment, and materials for grading, subgrade preparation, modified subbase, reinforced PCC paving, full-depth PCC patching, storm sewer modifications, permanent traffic signals at three intersections, pavement markings, traffic control, and site restoration. Bids must be submitted electronically by May 6, 2026, and the project requires performance and payment bonds, a maintenance guarantee for four years, and preference for Iowa-grown products and labor. Work is to commence within 10 days of notice to proceed, with substantial completion by October 31, 2026, and final completion by June 30, 2027.

View original listing