Opportunity
California eProcure #3CA07925
Replacement of Wastewater Treatment Plant with Pre-Engineered MBR System at CAL FIRE Pilot Rock Facility
Posted
April 21, 2026
Respond By
May 18, 2026
Identifier
3CA07925
NAICS
237110, 221320
This opportunity involves the replacement of the wastewater treatment plant at the CAL FIRE Pilot Rock Fire Center in Hesperia, California. - Government Buyer: - California Department of Forestry and Fire Protection (CAL FIRE), Office of Business Services, Contracts Unit - Project Scope: - Replacement of the existing 20,000 GPD extended aeration sludge package plant - Installation of a pre-engineered package Membrane Bioreactor (MBR) wastewater treatment system (5,000–25,000 GPD capacity) - System must comply with California Title 22 water quality regulations - Integration of SCADA (Supervisory Control and Data Acquisition) for remote monitoring and automation - Products and Services Requested: - Pre-engineered MBR wastewater treatment system - Engineering, design, and permitting services - Equipment procurement and fabrication (including factory acceptance testing) - Site preparation, demolition of existing plant, and foundation construction - Installation and integration of the new system, including SCADA setup - Commissioning, operator training, and submission of as-built documentation - Unique/Notable Requirements: - Contractor must hold a General Engineering Contractor (License Type A) - Mandatory pre-bid conference at the project site - System must be pre-engineered and factory-tested - Compliance with prevailing wage requirements if bid exceeds $1,000 - Incentives and goals for subcontracting to certified small, micro, disadvantaged, and disabled veteran businesses - Experience and bonding requirements for bidders - No specific OEMs or vendors are named in the solicitation, but the MBR system and SCADA integration are central to the procurement.
Description
This solicitation is for the replacement of the existing 20,000 Gallons Per Day (GPD) extended aeration sludge package plant at the CAL FIRE Pilot Rock Wastewater Treatment Plant (WWTP). The contractor is required to provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees necessary for the project. A mandatory pre-bid conference is scheduled to be held at the Pilot Rock Fire Center in Hesperia, CA. The project encourages participation from small businesses, disadvantaged businesses, and disabled veteran businesses, with specific goals for subcontracting to certified small and micro businesses.