Opportunity
PIEE #FA461326B0001
PVC Roof Replacement and Repair at F.E. Warren Air Force Base, WY
Buyer
FA4613 90 CONS PK
Posted
April 20, 2026
Respond By
May 20, 2026
Identifier
FA461326B0001
NAICS
238160
This opportunity from the U.S. Air Force at F.E. Warren Air Force Base, Wyoming, seeks qualified small business contractors for the repair and replacement of PVC roofing systems on six buildings at the installation. - Government Buyer: - U.S. Air Force, 90th Civil Engineer Squadron (90 CES), Contracting Office FA4613 at F.E. Warren AFB - Scope of Work: - Demolition of existing roofing and installation of new, fully adhered 80 mil PVC roofing membrane systems (white and gray variants) - Work covers buildings 1284, 325, 332, 1292, 1164, and 34 - Includes replacement of vent caps, gutter cleaning, and design/installation of a code-compliant lightning protection system for building 1164 - All work must comply with environmental, safety, and security requirements (including OPSEC and anti-terrorism training) - Coordination with base officials and adherence to F.E. Warren AFB Installation Facilities Standards required - Products and Materials: - PVC roofing membranes (80 mil, ASTM D-4434 Type II, NSF/ANSI Standard 347 Platinum) - Polyisocyanurate insulation boards, high density cover boards, adhesives (e.g., Sarnacol 2121), fasteners, flashing materials, metal copings, and accessories - Lightning protection system (engineer-designed and third-party certified) - Warranties: 20-year edge-to-edge from membrane manufacturers, 2-year installation warranty - Unique Requirements: - CMMC Level 2 (Self) certification required - Small business set-aside - Strict safety protocols (e.g., safety harnesses during site visits) - Entry Authorization List (EAL) management and escort requirements for secure areas - Winter suspension provisions for work scheduling - Estimated Contract Value: - $8 million to $13 million - Place of Performance: - F.E. Warren Air Force Base, Cheyenne, WY (multiple buildings and Weapons Storage Area) - Period of Performance: - Work begins within 10 days of Notice to Proceed - Base period: 180 days for BLD 1284; option periods for other buildings range from 60 to 120 days each - All work to be completed by the end of the ordering period, not to exceed the specified contract end date
Description
Please review all attachments pertaining to this requirement. Bids MUST be submitted through the PIEE Solicitation module. SITE VISIT Information A has been scheduled for 4 May, 9:00 AM (Mountain Daylight Time) and all parties will meet at the BLD 1...