Opportunity

Gwinnett County Bids #BL044-26 INV

Procurement of Four 108-inch Stainless Steel Slide Gates for Lanier Filter Plant

Posted

April 21, 2026

Respond By

April 27, 2026

Identifier

BL044-26 INV

NAICS

332999

Gwinnett County Department of Water Resources is seeking bids for the supply of four (4) large, 108-inch fabricated stainless steel slide gates for the Lanier Filter Plant in Buford, GA. - Government Buyer: - Gwinnett County Department of Water Resources, Purchasing Division - OEMs (Manufacturers) Highlighted: - Rodney Hunt Co. - H. Fontaine, Ltd. - Waterman - BNW Zero Leakage - Golden Harvest Inc. (GHI) - CASSI Flow Control/Dynamic - Approved equals also considered - Products Requested: - Four (4) 108-inch fabricated stainless steel slide gates - 1 for Clearwell Junction Box - 2 for Flow Diversion Structure - 1 for Overflow Structure - All gates must: - Be constructed of ASTM A240/A240M Type 316L stainless steel - Meet AWWA C561 standards for fabricated slide gates - Be compatible with existing electrical operators - Include guide frames, discs, stems, supports, and appurtenances - Not exceed allowable leakage as per AWWA C560 - Be designed for minimal modification to existing structures - Include shop drawings, O&M manuals, spare parts, and special tools - Services Requested: - Manufacturer’s representative services for installation assistance, inspection, and certification (total of 5 person-days) - Unique/Notable Requirements: - Supply-only contract (installation by others) - Manufacturer responsible for confirming fit and providing all support/bracing except anchor bolts - Detailed submittal, certification, and testing requirements - Delivery to Lanier Filter Plant, 2590 South Water Works Road, Buford, GA 30518 - Progress updates and submittal approvals required prior to manufacture

Description

This solicitation is for the purchase of four replacement 108-inch slide gates for the Lanier Filter Plant in Gwinnett County, Georgia. The gates are intended to replace existing ones that do not seal adequately, restoring operational flexibility for maintenance and isolation of clearwells. The procurement includes design, manufacture, assembly, and delivery of the gates, with the installation to be performed by a separate contractor. The gates must meet AWWA standards and be compatible with existing electrical operators, with detailed submittals and support materials required.

View original listing