Opportunity

New Brunswick Opportunities Network #MEM-2026-05

Triplex Booster Pump System Installation for Village de Memramcook

Posted

April 20, 2026

Respond By

April 30, 2026

Identifier

MEM-2026-05

NAICS

237110, 238220, 238210

This opportunity involves the supply, installation, and commissioning of a triplex booster pump system at the Petit Dover Tank Control Building for the Village de Memramcook, New Brunswick. - Government Buyer: - Village de Memramcook (Director of Engineering and Municipal Operations: Mr. Arthur Austin, P. Eng.) - Products and Services Requested: - Triplex booster pump system (three pumps: two duty, one standby) for potable water, each with a variable frequency drive (VFD) - Modifications to existing piping (stainless steel or equivalent), isolation and check valves, pressure gauges, recirculation line with pressure relief valve - Flow meter, pressure transmitters, and full SCADA/PLC integration - Electrical and control panel supply and installation, including programming, alarms, and monitoring - Testing, commissioning, and demonstration under normal and peak conditions - Training for Village operators and provision of documentation (shop drawings, as-builts, O&M manuals) - Unique or Notable Requirements: - All materials must be new and suitable for municipal water systems - System must be fully operational and integrated with existing SCADA/PLC - Minimum 12-month warranty on all equipment and installation - Contractor responsible for site verification and delivering a turnkey solution - No specific OEMs, brands, or part numbers are specified in the solicitation.

Description

The Village of Memramcook is soliciting proposals for the supply, installation, and commissioning of a booster pump system at the Petit Dover water storage tank control building. The project aims to improve water pressure within the high-pressure zone of the municipal water distribution system. The scope includes providing a triplex booster pump system with variable frequency drives, modifications to existing piping, integration with existing PLC and SCADA systems, electrical work, testing, commissioning, and training of village staff. Proponents are responsible for verifying all site conditions and delivering a fully operational system.

View original listing