Opportunity

Lancaster Ionwave #2026-04

Reconstruction of Houston School Road in Lancaster, TX

Posted

April 20, 2026

Respond By

May 28, 2026

Identifier

2026-04

NAICS

237310, 237990

This opportunity involves the complete reconstruction of Houston School Road in Lancaster, TX, managed by the City of Lancaster Public Works Department. - Government Buyer: - City of Lancaster Public Works Department (Dallas County, TX) - Project Scope: - Full reconstruction of approximately 0.56 miles of Houston School Road (from Danieldale Road to I-20 Service Road) - Installation of 10-inch, 4,000 psi concrete pavement reinforced with #4 rebars at 18-inch centers - 10-inch cement-treated base layer beneath pavement - Construction of turn-lanes at intersections (excluding median openings and driveway turn-lanes) - Additional work includes 6-inch monolithic concrete curbs, traffic control and signage, road striping, erosion control, manhole lid/water valve cover adjustments, and asphaltic joint sealing - Services Required: - Mobilization, base preparation, excavation, removal and haul-off of existing materials - Traffic control plans, permitting, and all geotechnical, construction, and materials testing for QA/QC - Unique/Notable Requirements: - Lump-sum, not-to-exceed (NTE) contract with itemized cost breakdown - Minimum five years' experience with similar local government projects and at least three completed street projects over $1,000,000 - Two-year maintenance bond required after final acceptance - All work must comply with City of Lancaster Standard Construction Details and General Construction Design Manual - No specific OEMs or vendors are named; open to qualified contractors meeting experience and bonding requirements - Anticipated project duration is five months from contract award

Description

The City of Lancaster Public Works Department is soliciting proposals for the total reconstruction of Houston School Road from Danieldale Road to I-20 Service Road, approximately 0.56 miles. The project involves complete street reconstruction with 10-inch 4,000 psi concrete pavement reinforced with #4 rebars, including turn lanes at intersections, but excluding median openings and driveway turn lanes. Contractors must provide all labor, materials, equipment, traffic control plans, permits, and testing for quality assurance. The contract is a lump-sum not-to-exceed amount, with a project timeline of approximately 5 months from award.

View original listing