Opportunity
Little Rock Littlerock #592436
Construction and Rehabilitation of Easterling Lift Station for Pea Ridge Water Utilities
Posted
April 19, 2026
Respond By
May 05, 2026
Identifier
592436
NAICS
237110, 238210, 238220, 238290
This opportunity involves the construction and rehabilitation of the Easterling Lift Station for Pea Ridge Water Utilities in Arkansas. - Government Buyer: - Pea Ridge Water Utilities Board of Directors - Project Scope: - Rehabilitation and installation of pumps and controls - Construction of a fiberglass reinforced plastic (FRP) control building and accessories - Electrical service improvements - Installation of a backup generator - Overhead monorail crane/hoist system installation - Site grading and cast-in-place concrete foundations - Installation of a 12-inch force main bypass line at the wastewater treatment plant site - Products/Services Requested: - Pumps and controls (rehabilitation and installation) - FRP control building and accessories - Electrical service - Backup generator - Overhead monorail crane/hoist system - Site grading - Cast-in-place concrete foundations - 12-inch force main bypass line - Unique/Notable Requirements: - 5% bid bond required with all submissions - Compliance with local, state, and federal regulations - Contract documents available for review and purchase at designated locations - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Place of Performance: - 885 N Curtis Avenue, Pea Ridge, AR 72751 (Easterling Lift Station site) - Additional contracting offices and document locations in Bentonville and Fayetteville, AR
Description
PEA RIDGE WATER UTILITIES is soliciting separate sealed bids for the construction of the Easterling Lift Station located at 885 N Curtis Avenue, Pea Ridge, AR. The project includes rehabilitating the lift station with pumps, controls, a FRP control building, electrical service, backup generator, overhead monorail crane/hoist system, site grading, and concrete foundations, as well as installing a small section of 12 Force Main bypass line at the wastewater treatment plant site. Bids must be submitted by 2:00 pm on May 5, 2026, and a 5% bid bond is required. Contract documents are available for review and purchase at specified locations.