Opportunity

Fountain Valley Planet bids #RFB # 26-009

Fountain Valley Street Rehabilitation and Resurfacing Project (Euclid St & Talbert Ave)

Posted

April 16, 2026

Respond By

May 14, 2026

Identifier

RFB # 26-009

NAICS

237310, 237110, 237990

This opportunity involves the rehabilitation and resurfacing of major streets in Fountain Valley, CA: - Government Buyer: - City of Fountain Valley, California (Orange County) - Products and Services Requested: - Removal and repaving of asphalt concrete on Euclid Street and Talbert Avenue - Removal and reconstruction of Portland Cement Concrete (PCC) curb, gutter, sidewalks, curb ramps - Construction surveying and monument preservation - Installation of fiber-reinforced asphalt courses (Forti-Fi fiber) - Utility adjustments (sewer and storm drain manholes, water valve cans, well monuments) - Installation and adjustment of traffic control devices (inductive loops, pull boxes, traffic signing, striping, pavement markings) - Landscaping, irrigation, tree and stump removal, relocation of fire hydrants and water meters - Product Line Items (selected examples): - Cold milling of existing AC pavement (474,850 sq ft) - Installation of 1" and 2" fiber-reinforced asphalt courses - Removal/reconstruction of 4" PCC sidewalk (5,926 sq ft) - Installation of inductive loops, pull boxes, and traffic control devices - Tree and stump removal (up to 19 units), landscaping, irrigation - Unique/Notable Requirements: - Compliance with City of Fountain Valley and Orange County Sanitation District (OCSD) standards for utility adjustments - Adherence to city standard plans for construction elements - All labor, materials, tools, equipment, and incidentals must be provided by the contractor - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Place of Performance: - Euclid Street (Slater Ave to Talbert Ave) and Talbert Avenue (Brookhurst St to Bushard St), Fountain Valley, CA - No period of performance or contract duration is specified in the solicitation.

Description

The City of Fountain Valley, California, is soliciting electronically sealed bids for the rehabilitation and resurfacing of Euclid Street from Slater Avenue to Talbert Avenue and Talbert Avenue from Brookurst Street to Bushard Street. The project includes removal and repaving of asphalt concrete, removal and reconstruction of PCC curb, gutter, sidewalks, curb ramps, and related work as per the provided plans and specifications. The scope also involves utility adjustments, traffic control, landscaping, and other associated construction activities. Bids must be submitted by 4:00 PM on May 14, 2026.

View original listing