Opportunity

Kentucky CGI Advantage 4 #RFB-785-2200000359-4

Kentucky Solicitation for Steam Boiler Replacement at Thomson Hood Veterans Center

Posted

January 27, 2022

Respond By

January 20, 2022

Identifier

RFB-785-2200000359-4

NAICS

238220, 238210, 238290

This opportunity involves the Commonwealth of Kentucky seeking bids for the replacement of steam boilers at the Thomson Hood Veterans Center in Wilmore, Kentucky. - Government Buyer: - Commonwealth of Kentucky, Department of Veterans Affairs - Division of Engineering and Contract Administration - Statewide Procurement Branch Manager: Kristi Sharp, CPPB - Products and Services Requested: - Demolition of two existing firetube boilers - Installation of five condensing boilers, each with a primary pump - Associated primary and secondary hot water piping - Combustion air delivery fans - Combined boiler flue - Replacement of all boiler secondary loop piping - Replacement of air separator (1 unit) - Replacement of two base-mounted hot water pumps - Upgrade of DDC controls for new pumps and boilers - Installation of a new power panel and small power distribution transformer for boiler primary pumps - Integration Requirement: - All new equipment must be integrated with and monitored by the existing Automated Logic building automation system - Notable Requirements: - Strict COVID-19 protocols for site visits and work (mandatory negative tests for all visitors) - Use of the Owner's Document Collaboration System for all project documentation - OEMs Mentioned: - Automated Logic (for building automation system integration) - No specific boiler OEMs, part numbers, or model numbers are specified in the solicitation.

Description

This solicitation is for the demolition of two existing firetube boilers and the replacement with five condensing boilers, each equipped with a primary pump, associated primary/secondary hot water piping, combustion air delivery fans, and a combined boiler flue. The project also includes replacement of all boiler secondary loop piping, air separator, two existing base mounted hot water pumps, and an upgrade to DDC controls for these pumps and boilers. Additionally, the boiler primary pumps work involves a new power panel and a small power distribution transformer. All new equipment will be monitored and controlled via the existing Automated Logic building automation system.

View original listing