Opportunity
SAM #PR15756088
Grounds Safety Improvement Project at U.S. Embassy Banjul CMR Compound
Buyer
U.S. Embassy Banjul
Posted
April 18, 2026
Respond By
June 01, 2026
Identifier
PR15756088
NAICS
238990, 238310, 238350, 238190, 238910, 238340
This opportunity involves a grounds safety improvement project at the U.S. Embassy's CMR compound in Fajara, Gambia, managed by the Department of State. - Government Buyer: - U.S. Department of State, U.S. Embassy Banjul, General Services Office - Scope of Work: - Repair and replace walkways, stairways, patio, and gazebo surfaces - Remove existing pavers, stones, and sunken areas - Install approved non-slip floor tiles and outdoor tiles - Replace uneven walkways and lay new pavers - Repair floor cracks and retile pool cabana patio floor - Install ABA/ADA-compliant handrails on stairways, patio stairs, and pool stairways - Repair or replace storm drainage system, including concrete drainage blocks - Replace and reconnect a prefabricated sink and plumbing in the pool cabana entertainment space - Construct an extra step and install ADA-compliant stair railing for pool stairways - Debris disposal and related construction supervision and management - Products/Services Requested: - Non-slip floor tiles, outdoor tiles, pavers (no specific OEMs or part numbers specified) - ABA/ADA-compliant handrails and stair railings - Prefabricated sink and plumbing materials - Concrete drainage blocks - Unique Requirements: - All handrails must comply with ABA/ADA standards - All materials must be approved by the U.S. Embassy prior to installation - Strict 30-day performance period after Notice to Proceed - Site visit required prior to bid submission - No specific OEMs or vendors are named in the solicitation.
Description
The US Embassy Banjul wishes to solicit bids for repairing the walkways, stairways, patio, and gazebo in the CMR compound. The repairs will include the removal of all existing pavers, stones, and sunken areas in the walkways and stairways, followed by their replacement with non-slip floor tiles. Additionally, the project will include repairing the storm drainage system and meeting safety requirements by installing handrails as per below scope of work (SOW). U.S. Government intends to award a contract to the responsible company submitting a technically acceptable quotation at the lowest price.