Opportunity
SAM # PR15922520
Electrical Safety Upgrade at U.S. Embassy Bogota Chief of Mission Residence
Buyer
U.S. Embassy Bogotá
Posted
April 17, 2026
Respond By
May 05, 2026
Identifier
PR15922520
NAICS
238210, 238290
The U.S. Department of State, through the U.S. Embassy Bogota's General Services Office, is soliciting contractors for a comprehensive electrical safety upgrade at the Chief of Mission Residence (CMR) in Bogota, Colombia. - Government Buyer: - U.S. Department of State, U.S. Embassy Bogota, General Services Office (GSO) - OEMs and Vendors: - Schneider Electric is specified as the OEM for the Main Distribution Board and circuit breakers - Products and Equipment Requested: - 208V Main Distribution Board (self-supporting metallic cabinet, IP44) with Schneider Electric circuit breakers and Class I+II surge protective device (quantity: 1) - Ladder-type trays (60 cm x 8 cm x 3, quantity: 5; 30 cm x 8 cm x 3, quantity: 3) - Various electrical cables (#6 AWG, #8 AWG, #10 AWG, #12 AWG, 2/0 AWG, 500 kcmil, etc.) - Tinned lugs, tubular splices, gel connectors, nuts, washers, bolts, anchors, cable ties, heat shrink tubing, tapes, and other electrical installation hardware - Reinforced concrete pedestals (quantity: 2) - Services Requested: - Relocation of the Main Distribution Panel (MDP) - Installation of transfer switch panels and auxiliary panels - Reorganization and upgrade of existing electrical wiring - Installation of surge protection devices - Testing, commissioning, documentation, training, and warranty - Unique or Notable Requirements: - All work must comply with Colombian RETIE 2024, NTC 2050, U.S. National Electrical Code (NEC), and OBO standards - Delivery is DDP (Delivered Duty Paid) to the Embassy warehouse in Bogota - Minimum one-year warranty on all work and materials - Project must be completed with minimal disruption to embassy operations - Includes design approval, schedule, and training for embassy staff
Description
It is required the relocation of the Main Distribution Panel (MDP), installation of the transfer switch panel(s) and other auxiliary panels, as well as the reorganization of existing electrical wiring, to modernize the facilities, improve wiring organization, increase technical safety, ensure regulatory compliance, and provide an efficient and safe electrical distribution.
SITE VISIT:A site visit and explanation of the scope of work is scheduled onApril 29, 2026 at 09:00 hours.If you are interested in attending, please send an e-mail to BogotaGSOcompras@state.gov using PR15922520 in the subject line, before April 24, 2026 at 12:00 (noon) including the name of your representative (Maximum 2 people), and ID number.
QUESTIONS:Should you have any question regarding this request please send an e-mail to bogotagsocompras@state.gov before May 1, 2026 at 4:00 PM (Bogota, Colombia - local time).
OFFER SUBMISSION:Please use PR15922520 the subject line.Offers are due by May 5 2026 at 4:00 PM (Bogota, Colombia - local time) via e-mail to bogotagsocompras@state.gov All responsible sources may submit an offer that shall be considered.
For complete information please see attachments of this notice.