Opportunity
Dalton Civicplus #PW-2026-SP-181
City of Dalton Stormwater Bypass System Construction Solicitation
Posted
April 16, 2026
Respond By
May 21, 2026
Identifier
PW-2026-SP-181
NAICS
237110, 237990, 237310
This opportunity involves the City of Dalton, Georgia's Public Works Department seeking proposals for the construction of the North Glenwood Avenue Bypass System, a major stormwater conveyance project. - Government Buyer: - City of Dalton, Georgia (Public Works Department) - Contracting office: 300 West Waugh Street, Dalton, GA 30720 - OEMs and Vendors: - No specific Original Equipment Manufacturers (OEMs) or vendors are named; project is open to all qualified contractors with GDOT prequalification and utility licenses. - Products/Services Requested: - Construction of stormwater infrastructure, including: - Installation of concrete box culverts, reinforced concrete pipes (RCP), junction boxes, manholes, headwalls, catch basins, drop inlets, and erosion control features - Demolition and removal of existing pavement, concrete, fencing, and utilities - Site grading, clearing, and grubbing (including tree removal) - Traffic control and night work on Glenwood Avenue - Utility adjustments and temporary services - Soil export to a designated spoil site - Site restoration (paving, seeding, fencing, etc.) - Detailed line items include: - Asphalt and concrete removal (e.g., 652 SY asphalt, 1,497 SY concrete) - Pipe removals and installations (various sizes and types, e.g., 72" Class III RCP, 6'x3' box culvert) - Manholes, catch basins, headwalls, and custom GDOT structures - Erosion and sediment control (silt fence, compost filter sock, riprap) - Pavement and driveway repairs, curb and gutter replacement - Allowances for unsuitable soils and rock removal - Unique or Notable Requirements: - Contractors must be GDOT prequalified and hold utility licenses - Mandatory pre-proposal meeting required - Night work required for lane closures on Glenwood Avenue - Compliance with Georgia Security and Immigration Compliance Act (O.C.G.A. ยง13-10-91) - Bid bond and notarized affidavit required - Proposals are numerically scored to encourage innovative solutions - Locations: - Project runs from 631 Glenwood Avenue to 622 North Elm Street, Dalton, GA, with additional work at 145 Raisin Way and 535 N Elm Street - Contracting office at 300 West Waugh Street, Dalton, GA
Description
The City of Dalton, Georgia, is soliciting sealed competitive proposals for the construction of the North Glenwood Avenue Bypass System, a stormwater conveyance project extending from 631 Glenwood Avenue to 622 North Elm Street. The scope includes installation of stormwater infrastructure, utility adjustments, open trenching, demolition and replacement of asphalt and concrete, clearing and grubbing, traffic control, and site grading. Proposals must comply with Georgia state regulations and include required affidavits. A mandatory pre-proposal meeting is scheduled, and proposals are due by May 21, 2026.