Opportunity

Central Florida Tourism Oversight District Planet bids #ITB# C007067

Electrical Infrastructure Phase II Project – Installation of Owner-Furnished SCADA, Transformers, and Electrical Systems

Posted

April 15, 2026

Respond By

April 30, 2026

Identifier

ITB# C007067

NAICS

238210, 237130

This opportunity involves the Central Florida Tourism Oversight District (CFTOD) seeking contractors for the Electrical Infrastructure Phase II project in Lake Buena Vista, Florida. - Government Buyer: - Central Florida Tourism Oversight District (CFTOD), Utilities Services division - Project Scope: - Installation of electrical infrastructure: concrete encased duct banks, direct buried conduits, concrete manholes, fiber optic pull boxes, and 600V THWN secondary conductors - Installation of owner-furnished equipment: SCADA systems, transformers (6000kVA and 1800kVA), switches, 15kV cable, cable splices, cable terminations, and air terminal compartments - Transportation and installation of heavy transformers using cranes and trucks - Construction services including labor, supervision, equipment, permitting, and compliance with codes and standards - Products and Services Requested: - Multiple line items including duct banks, conduits, manholes, fiber optic infrastructure, transformer installation, switchgear, SCADA racks and cabinets, and related electrical work - Services include construction, equipment transport, utility outage coordination, and safety/compliance management - Unique or Notable Requirements: - Strict compliance with Epcot Building Codes, National Electric Code, National Electrical Safety Code, and OSHA standards - Certified electrical license required - Project Specific Safety Plan (PSSP), lockout/tagout procedures, and crane lift plans mandatory - Coordination with Reedy Creek Energy Services for utility outages - Warranty of at least one year on labor and materials - OEMs and Vendors: - No specific OEMs are named; all major electrical and SCADA equipment is owner-furnished - Locations: - Project area between Hollywood Studios and Victory Way Substation, Lake Buena Vista, Orange County, FL - Equipment delivery from 5300 Center Drive, Lake Buena Vista, FL - CFTOD offices at 1900 Hotel Plaza Boulevard, Lake Buena Vista, FL - Award Basis: - Lowest responsive bidder for all items - Period of Performance: - 180 days from Notice to Proceed or until specified completion date, with work generally Monday through Friday, 7:00 AM to 4:00 PM, and some exceptions for tie-ins

Description

The Central Florida Tourism Oversight District (CFTOD) is soliciting bids for the Electrical Infrastructure Phase II project, which involves installation of electrical infrastructure components such as concrete encased duct banks, direct buried conduits, concrete manholes, fiber optic pull boxes, and 600V secondary conductors. The work also includes installation of owner-furnished SCADA equipment, transformers, switches, 15kV cable, cable splices, cable terminations, and air terminal compartments. The project requires a certified electrical license and has a duration of 180 days from the notice to proceed or until December 15, 2026, whichever comes first. The award will be based on the lowest bidder of all items.

View original listing