Brazos Valley Ionwave #018-07-26 Addendum 1 (Reconstruction of Shady Lane Substation)
Reconstruction of Shady Lane Substation for Bryan Texas Utilities
Posted
April 15, 2026
Respond By
May 13, 2026
Identifier
018-07-26 Addendum 1 (Reconstruction of Shady Lane Substation)
NAICS
237130, 237990
Bryan Texas Utilities (BTU) is seeking bids for the comprehensive reconstruction of the Shady Lane Substation in College Station, Texas. - Government Buyer: - Bryan Texas Utilities (BTU), a municipal utility in Bryan, Texas - OEMs and Vendors: - Burns & McDonnell Engineering Company, Inc. (designer of record for project plans and specifications) - Products/Services Requested: - Demolition of existing substation structures and hazardous materials abatement (including lead paint) - Installation of new 69kV and 12.47kV substation equipment (steel monopoles, buswork, circuit breakers, transformers, protection relays, control panels) - Construction of underground duct banks (PVC and aluminum conduit systems) - Construction of a 20' x 30' control building - Civil and structural works (grading, erosion control, foundations, fencing) - Installation and commissioning of all substation electrical equipment and protection/control systems - Unique or Notable Requirements: - Coordination with the City of College Station - Strict adherence to BTU and Burns & McDonnell standards - Phased demolition and construction to minimize station outages - Owner-furnished underground cables and terminations to be installed by contractor - Mandatory pre-bid meeting and site visit for all bidders - Handling and disposal of hazardous materials - All work must comply with detailed engineering drawings and specifications provided in the solicitation.
Description
This solicitation is a request for bids for the reconstruction of the Shady Lane Substation located in College Station, Texas. The project involves demolition of existing features, installation of new electrical substation equipment, underground duct banks, civil works, and protection and control systems. A mandatory pre-bid meeting and site visit are scheduled, and electronic bids must be submitted by May 13, 2026. The solicitation includes detailed engineering drawings and specifications for various aspects of the substation reconstruction.