Opportunity
Mississippi Procurement Portal #3170035510
Columbus, MS Seeks Bids for Summerhaven Drive Drainage Improvements Construction
Posted
April 15, 2026
Respond By
April 16, 2026
Identifier
3170035510
NAICS
237110, 237310, 237990
The City of Columbus, Mississippi is seeking bids for the Summerhaven Drive Drainage Improvements construction project. - Government Buyer: - City of Columbus, Mississippi (Office of the Mayor) - Scope of Work: - Provide all labor, equipment, and materials for drainage improvements along Summerhaven Drive - Construction services include: - Excavation and site grading - Removal and replacement of curb and gutter - Installation of drainage inlets and concrete flume - Placement of rip rap and geotextile fabric for ditch stabilization - Products/Materials: - Concrete piping - Rip rap and geotextile fabric - Services: - General construction, excavation, grading, and drainage structure installation - Unique Requirements: - Project must be completed within 30 calendar days - Liquidated damages of $200 per day for delays - Additional special damages may apply for extended engineering and inspection costs - Certificate of Responsibility required for bids over $50,000 - Bid security (5%) and performance/payment bonds (100% each) required - No specific OEMs or named vendors are identified in the solicitation - Place of Performance: - Summerhaven Drive, Columbus, MS - Contracting office at City Hall, 523 Main Street, Columbus, MS
Description
The City of Columbus, Mississippi is soliciting sealed bids for the Summerhaven Drive Drainage Improvements project. The work includes excavation, site grading, curb and gutter removal and replacement, drainage inlet installation, concrete flume installation, rip rap, and geotextile fabric along an existing drainage ditch. Bids can be submitted in person at City Hall or electronically via the specified website until 2:00 PM local time on April 16, 2026. The project requires contractors to provide all labor, equipment, and materials as specified, with a contract time of 30 calendar days and associated liquidated damages for delays.