Opportunity
City of Los Banos #24-PK-0001
Construction and Park Equipment Installation for Sunrise Ranch Park, City of Los Banos
Posted
August 30, 2024
Respond By
September 06, 2024
Identifier
24-PK-0001
NAICS
238990, 238910, 561730
This opportunity involves the construction of Sunrise Ranch Park for the City of Los Banos, with a focus on both site development and installation of park amenities. - Government Buyer: - City of Los Banos Public Works Department - Contracting office: City Clerk, 520 J Street, Los Banos, CA 93635 - Vendors and Bidders: - Ronny's Inc. (lowest bidder, Notice of Intent to Award issued) - Other bidders: Graniterock, Westside Landscape & Concrete, TBS Contractors - Products and Equipment Requested: - Playground equipment (allowance for fully functional play equipment) - Concrete picnic tables (3 standard, 1 ADA) - Benches, BBQ pits (2), cornhole boards (2 sets), basketball goal (1), park sign (1) - Concrete trash/recycling receptacles (2), shade structure (1) - Site furnishings, fencing (4' high decorative steel, 592 LF), landscape edging (96 LF) - Irrigation system (full system, controller, flow sensor, master valve, backflow, booster pump) - Electrical equipment (service pedestal installation) - Plant materials: shrubs (598), 15-gallon trees (37), sod turf (12,894 SF), organic mulch (16,066 SF) - Services Requested: - Demolition, site preparation, grading, erosion/sedimentation control - Installation of all park features and amenities - Paving (asphalt, concrete flatwork, decomposed granite) - Playground area construction (subsurface infiltration sumps, poured-in-place rubber surfacing, entry ramps) - Retaining and seat wall construction - Landscape and irrigation installation - 120-day post-construction maintenance period - Project management, mobilization/demobilization, bonding - Unique/Notable Requirements: - Compliance with California prevailing wage laws - Contractor must hold valid California State Contractor’s License (Class A or C-27; C-61/D-34 as needed) - Registration with California Department of Industrial Relations - Mandatory pre-bid meeting - Strict adherence to project schedule and maintenance period - No specific OEMs for playground or site furnishings named; technical specs reference standard sections for these items
Description
The City of Los Banos is soliciting sealed bids for the construction of Sunrise Ranch Park. The project includes demolition and site preparation, paving and hardscape, retaining and seat wall installation, playground area with drain sumps and surfacing, site furnishings such as playground equipment and benches, landscape and irrigation improvements, and other related site work. Bids are due by 2:00 p.m. PST on September 6, 2024, with construction completion targeted by April 1, 2025, and final acceptance by June 30, 2025. Contractors must comply with prevailing wage laws, hold appropriate California contractor licenses, and attend a mandatory pre-bid meeting on August 9, 2024.